At a glance
The Common Council's Code and Infrastructure Committee met Thursday, October 15, 2026, with members Henry Haddad, Dewan Sarowar, and Jason Foster attending. DPW Superintendent Rob Perry presented his monthly report covering sewer operations, water supply, street maintenance, the combined sewer overflow separation project, and reimbursements for the Ferry Street Bridge. The committee also discussed planting maintenance on Front Street near the waterfront and fielded questions about street conditions and parking enforcement.
Roll call and attendance
The meeting opened with roll call. Henry Haddad, Dewan Sarowar, and Jason Foster were present, along with DPW Superintendent Rob Perry.
Key points
- Jason Foster chaired the meeting, calling it the Code and Infrastructure Committee meeting of October 15, 2026.
- Members present were Henry Haddad, Dewan Sarowar, and Jason Foster.
- Rob Perry, DPW Superintendent, was present to deliver his monthly report.
Sewer operations and new SPDES permit
Rob Perry reported that the city received a new state discharge permit after many years, replacing one from 2003 or 2004 that did not reflect the 2010 sewer plant upgrade.
Key points
- Septage revenue for August was $59,415, with a projected surplus of about $40,000 for the year.
- The state issued a new SPDES permit, the first since 2003 or 2004, before the $12.5 million sewer upgrade in 2010.
- The new permit requires a sampler at the contact tank to test overflow events, similar to secondary effluent testing.
- New sampling requirements include mercury, ammonia, chloroform, and PFAS, plus wet chronic testing at two points on the Hudson River: one upstream in Coxsackie as a baseline, and one downstream near the plant.
- PFAS testing is required because dish soap from Teflon pans can introduce the chemical into wastewater; the city's drinking water has tested non-detect for PFAS even at the state's threshold, 500 times lower than the federal standard.
The transcript refers to the permit as a 'Speedy's permit' and 'speeies permit,' likely auto-caption errors for SPDES (State Pollutant Discharge Elimination System).
Sewer plant maintenance and equipment replacement
Perry described routine maintenance on the sewer plant's secondary clarifiers and the purchase of a new secondary pump to replace one that could not be repaired.
Key points
- Crews drained and hosed down the secondary clarifiers, including the baffles and weir teeth that hold back floating material before final chlorine disinfection.
- The city purchased a new secondary pump after determining the old one could not be repaired; the replacement cost about $30,000 to $35,000.
- The plant is 15 years old, and some pumps can be repaired while others must be replaced.
- Perry noted that replacement costs are why the sewer operates its own fund.
Combined sewer overflow separation project update
The city submitted engineering plans for the combined sewer overflow separation project to the state Environmental Facilities Corporation for technical review; the city expects to bid the project in November or December.
Key points
- Engineering plans were submitted to the state Environmental Facilities Corporation (EFC) in the summer for technical review.
- EFC gave the city responses requiring a few weeks of revision work; nothing was out of line or unexpected.
- After revisions, the plans go back to EFC for a second, faster review before the city is authorized to bid.
- The city hopes to put the project out to bid in November, or certainly December, so contractors can be selected over the winter.
- Construction will start from the bottom up, meaning the largest pipes and structures must be fabricated first; smaller components can be made later.
The city expects to release the bid for the combined sewer overflow separation project in November or December 2026.
Water supply grant and transmission line work
Perry described a water supply grant application for upgrades to the transmission line and pump stations, including replacing soft-start equipment with variable frequency drives.
Key points
- The city applied for a water supply grant covering the transmission line, pump stations in Claverack, and other upgrades.
- Current pump equipment uses soft starts, which slow the pump's initial speed but do not allow variable speed control.
- The city hopes to convert to variable frequency drives (VFDs), which act as a brain for the pump and enable speed control.
- Findings from the engineering report will be used to apply for additional grants.
Water main break on Spring Street
A small water leak on Spring Street, suspected for months, was found and repaired with a sleeve after excavation revealed a tiny crack.
Key points
- Water had been leaking on Spring Street for a couple of months.
- DPW did leak detection on service lines, hydrants, and other infrastructure but could not locate the source initially.
- After excavation, crews found a very small crack in the water main and installed a sleeve to seal it.
Fire hydrant replacement program
The city has about 250 hydrants, with 20 currently out of service. DPW is replacing older Mueller hydrants whose parts are no longer available, at about $5,000 per hydrant.
Key points
- Hudson has about 250 hydrants citywide; 20 are currently out of service.
- The city's standard for many years was Mueller hydrants, but parts for older models are hard to find or unavailable.
- DPW is replacing hydrants rather than repairing them, at a cost of about $5,000 per unit including the isolation valve.
- Four hydrants have been replaced so far; the work will continue over a couple of years, prioritizing the worst cases.
- New hydrants use the storz connection, which the fire department requested as a standard.
Water main cleaning (pigging)
DPW cleaned sections of the city's water transmission mains using a poly pig, a scrubbing device pushed through the pipe by water pressure.
Key points
- Crews pumped water from the creek into the transmission line to push a poly pig (a steel-brush scrubbing tool) several miles through the pipe.
- The pig scraped sediment from the inside of the pipe; the water coming out of the receiving pit was brown with the loosened material.
- After several passes, the water ran clear.
- One section was cleaned from the Claverack Reservoir; crews removed a section of pipe, inserted the pig, replaced the pipe, and pressurized it.
- After cleaning the Churchtown line, air trapped in the drained pipes caused the treatment plant's clarifiers to look fizzy for a day or two, but did not harm the process.
The transcript refers to 'Cloud Reservoir' and 'Churchtown Reservoir,' likely the same location or nearby facilities in the Claverack area. 'Tonic line' may be another caption error for a specific transmission line name.
Park Place stop sign placement and traffic flow
A new stop sign was installed on Park Place in an unconventional location because existing infrastructure (a crosswalk beacon, DOT signs, and street lights) could not be easily moved.
Key points
- The stop sign at Park Place is placed out in the roadway rather than at the curb.
- Moving it would require relocating a rectangular rapid flashing beacon (RRFB) with a two-foot concrete base set four feet deep, plus state DOT signs and street lights; that work would take months and significant money.
- The sign was finally hit by a vehicle after being in place longer than expected.
- DPW is considering installing a spring-loaded sign that bounces back after being hit, though it could scrape a tractor-trailer if it snaps back while the truck is alongside it.
- Members noted that the stop sign has improved traffic flow by preventing cars from having to wait at Park Place, and that it is working well overall.
Signage and free-speech sign removal
A resident asked about attaching a free-speech sign to a stop sign; Perry explained that only traffic-control or safety signs can be mounted on a stop sign.
Key points
- A free-speech sign was attached to a stop sign; Perry said federal standards allow only traffic-control or safety signage on stop signs.
- Examples of allowed signage include an all-way bar or clarifying text for the stop sign itself.
- Code Enforcement Officer Nick is removing unauthorized signs from utility poles on Worth Avenue and other streets, including advertisements placed high up.
- Nick notified the utility companies that signs would be removed if they did not respond; he is issuing warnings and will continue removing signs as he finds them.
Tree removal and property maintenance
DPW removed a dead tree from the city lot at Fourth and State Streets and cleared a large willow that fell on Lower State Street.
Key points
- A dead tree was removed from the city's lot at Fourth and State Streets.
- A large willow tree on Lower State Street came down on a Saturday; DPW pushed it over the guard rail so the property owner could handle it.
DPW services to non-city agencies
Perry noted that DPW maintains properties owned by HCDPA, HDC, and the IDA without reimbursement, including snow removal and mowing, though the work is not a huge burden.
Key points
- DPW performs tasks historically assigned to it that are not strictly DPW functions, such as securing auction properties.
- The department mows and shovels properties owned by HCDPA, HDC (Hudson Development Corporation), and the IDA, which do not contribute to the cost.
- Perry said the work is not a huge inconvenience but noted that the city is maintaining properties it does not own.
Oakdale Lake overflow drain maintenance
Someone removed the grate from the overflow drain at Oakdale Lake, allowing sticks to clog the pipe; DPW cleared the blockage and replaced the screen.
Key points
- A caller reported that the grate had been removed from the overflow drain at Oakdale Lake.
- Without the screen, the overflow pipe filled with sticks and debris and became clogged, causing water to back up.
- DPW cleared the pipe and replaced the grate; Perry speculated someone removed it either thinking they were helping or to avoid cleaning the screen.
Paddock Place ravine drainage and storm water
A large ravine between Paddock Place and Joslen Place fills with storm water during heavy rains, much of it from the Town of Greenport. DPW built a temporary road to access and clear the discharge pipe.
Key points
- A ravine between Paddock Place and Joslen Place fills with 12 to 15 feet of water during heavy rains.
- More than half the water comes from the Town of Greenport, draining from Kline Street, Arthur Avenue, and the area behind Aldi and McDonald's.
- A 24-inch corrugated metal discharge pipe at the bottom of the ravine carries water under houses on Paddock Place to a ravine along school property.
- DPW built a road into the ravine to access and clear the pipe, which is roughly 100 years old and in poor condition.
- The goal is to keep the ravine from staying flooded for days or a week at a time; in the past DPW has pumped water out and discharged it across the street.
Perry said the majority of storm water in this ravine originates in Greenport, outside the city limits, and flows into Hudson's infrastructure.
Sinkhole investigation and property owner responsibility
DPW investigates sinkholes to determine whether they originate in city infrastructure or private laterals; when a lateral is the source, the property owner is responsible for repairs.
Key points
- When a sinkhole appears, DPW does the preliminary investigation, sometimes removing a section of pipe to find the source.
- In one recent case, the source was a lateral (private sewer line) from a house; concrete around the pipe had washed away.
- Once the source is identified as private, DPW informs the property owner, who hires a contractor to make repairs.
- Perry estimated the city's investigative work in this case was worth about $4,000, which it absorbed rather than billing the property owner.
July 29 rainstorm and basement flooding
A rainstorm on July 29 dropped 9 inches of rain in 24 hours, causing widespread street flooding. Perry said no sewer system can handle that volume; the fire department received 40 to 50 reports of water in basements.
Key points
- Nine inches of rain fell in a 24-hour period on July 29, 2026.
- A photograph showed a person standing on the sidewalk on 8th Street with water up to their knees.
- Perry said no system in the world can handle that amount of rain in one day; it is a flood.
- The fire department received 40 to 50 complaints of water in basements, though they do not pump basements.
- Water disappeared quickly once the rain stopped; Perry said his own basement, which has persistent groundwater issues, took on a couple of inches from the combined sewer backing up.
Ferry Street Bridge reimbursements and concrete cracking
The city received $3.2 million in June for the Ferry Street Bridge and expects another $2.5 million in December. The bridge's high-strength concrete has cosmetic cracks, a known issue with the state-required material.
Key points
- The Ferry Street Bridge project is complete; the city has been working with the treasurer to secure reimbursements.
- The city received $3.2 million in June; the local construction share was about $2.5 million, submitted to the state Department of Transportation in September.
- The city expects to receive the $2.5 million reimbursement in December 2026.
- The bridge deck has cosmetic cracks, which Perry said are common with the high-strength concrete the state requires but are not structural.
- Perry questioned the state's specification, saying regular 4,000 psi concrete used on sidewalks does not have the same cracking issues; the high-strength mix is drier and cures differently.
The city expects to receive $2.5 million from the state Department of Transportation in December 2026 for Ferry Street Bridge construction costs.
Flood plain administrator training
Perry will attend a flood plain insurance program conference in Ariskany next month, following his designation as flood plain administrator under a city code amendment.
Key points
- The Common Council amended city code to designate Rob Perry as flood plain administrator.
- Perry will attend a flood plain insurance program conference in Ariskany (central New York) in November 2026.
Flooding at Second Street and storm water discharge
A committee member asked whether grants could fund drainage improvements at Second Street, which floods during heavy rains. Perry explained the area drains to North Bay through a 36-inch pipe that is overwhelmed in extreme storms.
Key points
- The intersection at Second Street floods during heavy rain events, sitting lower than the dog park but higher than wetlands beyond it.
- Storm drains along Second Street discharge through a 36-inch pipe into North Bay, on the far side of Craftech's parking lot.
- Perry said the pipe is overwhelmed during extreme rainfall (4, 5, 7, or 10 inches), but the intersection remains passable and water dissipates within hours once rain stops.
- The member asked whether state grants for flooding mitigation could address the problem; Perry noted the infrastructure already exists and is simply overwhelmed during extreme events.
Front Street plantings and maintenance
Diana, a resident, raised concerns about the condition of plantings on Front Street near Warren, installed as part of a 2025 sidewalk project. Some plants are thriving while others, especially in a central planter, are struggling.
Key points
- Plantings were installed on Front Street near Warren during a 2025 sidewalk project; some were planted in a heat wave and struggled initially.
- A year later, some plants are doing well while others are not; some planting cutouts were intentionally left as lawn rather than planted.
- The worst-looking planter is the large central one at the intersection with Warren, directly across from the Promenade Hill entrance.
- The plantings were part of a completed project; final payment has been made to the contractor and the city is seeking final reimbursement of about $500,000.
- Going forward, maintaining or replanting would require a line item in the city budget and an agency or volunteers to do the work.
- Perry suggested a Friends group or resident sponsors for individual planters; members discussed whether the Conservation Advisory Council or a similar group could take it on.
The plantings are in the city right-of-way but are not covered by the completed project contract. Future maintenance would require city budget allocation or volunteer effort.
Public comment and follow-up questions
A resident named Bill raised three issues: the condition of Glenwood Boulevard, the lack of parking signs on Storm Avenue, and the cracking concrete on Ferry Street Bridge. Perry responded to each.
Key points
- Bill said one side of Glenwood Boulevard between the lakes has been patched but the other side, where people typically walk, has not been addressed.
- Perry said the patched side was the one a resident requested; the other side will likely be included in next year's paving project.
- Bill said a resident raised the issue of overnight parking on Storm Avenue blocking snow removal several months ago, and no signs have been installed.
- Perry said the committee discussed whether to use odd-even or specific-day parking rules but never finalized the decision; it is one block with no houses facing the street, and the sweeper works around it.
- Bill asked whether Perry expected the Ferry Street Bridge concrete to crack; Perry said no, but the cracking is superficial and not structural, a known issue with the high-strength concrete the state requires.
Adjournment
The committee voted to adjourn.
Key points
- Jason Foster called for a motion to adjourn.
- The motion was made, seconded, and carried.
About this page
FUTURE HUDSON is an experiment in civic engagement: every public meeting of the City of Hudson since January 2026, transcribed and made readable, so any resident can follow what the city is deciding without attending every meeting. This page covers one meeting; see the full archive.
How it was made
The meeting video was transcribed automatically; the transcript was then organized into sections and summarized. The raw transcript is above, every claim can be checked against it.
What to be skeptical of
The transcript is automated and contains speech-recognition errors; names and numbers may be wrong. This page has not been reviewed by a human. Nothing here is an official record, the city's official minutes are authoritative.