727 of 727 lines
- Part 1
- 0:00What if you just hit the mute button on your laptop? That little icon, the little key there.
- 0:06Yep.
- 0:07Yep.
- 0:08You said something else.
- 0:09Did it.
- 0:10That worked. Okay. Done.
- 0:13Okay. Did everyone can Can you guys hear me?
- 0:17We can hear you fine. No echo now.
- 0:19Okay. Now, I'm going to try to share, but it just won't let let me share. So uh I am going to walk you guys through it. I I you know otherwise I mean code enforcement officer Fox is correct. We have our attorney online remote and we have two commissioners remote. So we'll just
- 0:44we'll just plow through.
- 0:45Yeah. As far as
- 0:48we're on So we have
- 0:50Right. So we have uh it is uh 10:25 and we have five CFA votes. Um and I will just try to do my best. Okay. So first we have um wherever it is 528. Uh and that was Mr. Andrew Trudeau's um
- 1:16the dormer windows. Uh, and if you'll recall everyone, it's 526 528. It's a big renovation. He came back two weeks ago and asked to extend the rear dormer on the fourth floor, which is the attic. And he wants to take the two separate dormers and complete and continue it um across. So, effectively one dormer.
- 1:41Jan, I didn't get an we didn't I didn't see an application on this. So, if the board's ready to approve this, I think we should just make sure that Nick collects the application and has one on file.
- 1:53Thank you for mentioning that, attorney. Uh, we did get an application this morning. So, we do have application for that on file.
- 2:02Perfect.
- 2:07Paul and all favor. Okay. Next up is 336 uh Warren Street and uh we just need a date on that. Uh that was for the replacement of the front door. Um and I want to say that was the uh the VFWW uh application,
- 2:30right? So it was a metal door from the 60s with three funny um windows on it. And I'm just bringing it up just Oh, of course I don't have it. No, we knew.
- 2:43Oh, that was the sign. Okay. It was the metal kick plate door with the three windows and he wants to replace it with a solid wood door with
- 2:52two windows, I think.
- 3:02Okay. Uh, next up we have 314 Warren Street. Um, and that was uh for the conversion of the lower rear store room and vestable. Uh, the gentleman uh wanted to, it was mostly an internal job, but take down the wall and build a little home office thing and possibly install a powder room or a toilet where the sink was. 33 314 Warren Street. Okay. Uh, next up is Six Union Six Union Street. And that's the replacement of the wooden stoop with a concrete stoop. And that was where we had uh delayed the the vote because we wanted to make sure it was legal. She wants to match the twin town home, the stoops on both town home, the adjacent town homes.
- 4:02Their buildings are connected. Um it was I looked it up and with the the state codes say that when we have a historical building
- 4:17right so so just for for everyone at home attorneyo uh commissioner shoel and stein um it's it's not the the code compliant but it is historically correct to match the the twin town home. So that's that's what she's doing. Okay. And finally, uh we have 740. Um and we did receive uh attorney, we received the attic wind window. Uh we asked the gentleman, he's turning for his client. He's allowing more light. and we asked for photographs to to demonstrate what he would like to do and he indeed uh this is the old one. Okay.
- 5:06I
- 5:07but I don't we don't I don't have a C of A prepared for that because the board asked him to come back and show and present what that layout could be because there was not a C of a boat vote on.
- 5:18This is the one where it was the dormers
- 5:22and um the gable ends and he wanted to put in a window that the board was not sure was appropriate and so you asked him to go and do some removal and actually have a an up-to-date sketch. So that should be presented to the board for review.
- 5:38I am showing it on screen right now. I know you guys can't see it, but um it's right.
- 5:45Yes, that's it.
- 5:46Yes. Okay. So, this is what he's proposing. Um
- 5:53I don't know if you can see that.
- 5:57Yeah. Uh, he did include
- 6:18he's right here.
- 6:20Oh,
- 6:23what kind of windows are they? What are they made of? It's all one unit.
- 6:47You and everybody else from Can you guys see the screen good now? Does that kind of work?
- 7:10No.
- 7:11No.
- 7:11Yeah, we can't actually see it. It's It looks like a white square for us.
- 7:16Um, it doesn't look like Nick, did you email this around because I don't I can't find it in my email. We had a lot come through um this week. There's a lot on the agenda. So um if I haven't, I will
- 7:32only because I would share it, but I I can't find it.
- 7:37Gotcha.
- 7:38That was a good idea.
- 7:39Well, what's the next one? We'll see if you got if you can share the next one. Maybe. Maybe
- 7:50the continuations uh 702704 Columbia Street uh and that was the stock and our applicant uh sent us two uh renderings uh last night.
- 8:06Yes, I'm here. I won't it won't let me put my camera back on.
- 8:10Wait, so what happened with 740? Was there a vote? No, I think uh I think what we need to do is there's no CFA obvious 74 74 application. So this is commissioner has requested with the with the fence. Um this
- 9:13so this is can you guys see this? So this is the fence that is proposed.
- 9:18Okay.
- 9:19Um and I I imagine
- 9:22the applicant who is online would like to talk to us about this.
- 9:28Um yes. I just wanted to try to send better f photos as that was what was asked where you can see it in relation to the building. And in doing that, I noticed that I think these fences disappear a bit more when they're when they're dark. I could I was going to paint it white, but looking at photos and stuff, I'd rather it dis be nice, but disappear more. So then I thought I would do it the same color as the building.
- 9:57Mhm.
- 9:58That's the main change.
- 10:00I think we also really we you you showed us a number of fence options last time, Savannah. Could we maybe see what you settled on? And I think that will be what we need.
- 10:10Yes, it's the like thin stockade fence with with the doggy at the top, but they're only 3 in each one.
- 10:20Okay.
- 10:20So, not the not the thick ones, the thin ones.
- 10:23Great. All right. I think that's great.
- 10:26Commissioner Shel,
- 10:28we can see it. It's great. I got it. I vote yes.
- 10:31Okay. Wonderful. Thank you.
- 10:33Okay.
- 10:35Okay. Okay. So again, this this is a
- 10:39Thank you.
- 10:42Thank you.
- 10:43This is an application.
- 10:45It's a continuation. So we just need to approve and she will have her CFA in two weeks.
- 10:50Excellent. Motion to the application. All that good stuff. Cara and Paul. All in favor? Okay.
- 11:11Did you get that, Savannah?
- 11:15To be honest, I I couldn't really hear everyone, but um
- 11:20you're approved and we will uh vote. We will give you the stamped CFA in about two weeks.
- 11:26So, you are Thank you. Thank you.
- 11:28You can go ahead and order the fennis.
- 11:31Okay, great. Thank you.
- 11:33Thank you. Okay, next up is uh seven. This is continuation again. This is 7-9 Seventh Street. Um and we asked for uh this is the gentleman who is is he in person here? Billy. Hi, Billy. Do you want to tell us what you're doing or what you what you sent to us so we can Yeah. Wait a second. was over.
- 12:35Oh, up top. Okay. Jen, we really can't hear anything on the phone. Just if you could recap it after he speaks briefly
- 12:58or ask him to stand up and come stand near the table.
- 13:05I've got the got the iPad. So, um, yeah, just basically matching the the trim up top, uh, that was charred really bad by a 2001 fire. We took all the stucco off and we took the aluminum off the top. Uh, so proposing to cut away a 14oot section of the trim up top and uh, and match what's on either side.
- 13:33Okay, great. Okay. So that's okay.
- 13:36So just that bottom where there used to be trim of the boards
- 13:39like for like material and like for like appearance then you don't need the approval for that. But I think on the
- 13:46windows
- 13:47yeah the windows slight change uh based on feedback at the last meeting. So uh added transom windows above the doors and uh I'm looking Yeah. glass doors on either side. I thought the door on the right was original but I don't think it is original. Um, so I think the only original is the middle one and um, so I want to pretty much match that middle door and uh, adding a mountain applied mountain on those large uh, windows. Um, yeah, that part there.
- 14:20Thank you.
- 14:21It already looks a lot better.
- 14:22Thank you.
- 14:27Yeah. So there there's a brick facade, but there's no brick on that south side, and there's no brick on the back. Uh so proposing to replace the southside uh vinyl siding with uh with pine, clapboard, 3-in reveal, uh with a clear coat, uh anything that's painted or with a darker stain kind of contrasted too much with the brick. Uh so just proposing that Yeah, it's an applied. Okay. Okay.
- 15:39Yeah, that works for me.
- 15:41Yeah, that works.
- 15:42Okay.
- 15:43It's just a small board that Yeah.
- 15:47Yeah. Yeah. Exactly.
- 15:50Yeah.
- 15:51Yeah. Sounds good.
- 16:01Yeah. And just um
- 16:05Thank you. Thank you. So, um,
- 16:21Victoria, it's on the CFA. You'll just have to put the condition that they there won't be muttons on those storefront windows.
- 16:29No muttons on top.
- 16:31Yeah, those dividers that separated the top there. So, it's just going to be one um one large pain.
- 16:39Okay. Thank you for repeating that because we didn't couldn't hear that.
- 17:01Thank you. Next up is uh Kevin, Mr. Conklin uh 537, may I ask you to uh display?
- 17:12You can. Let's see here.
- 17:18Do you see my screen?
- 17:21Success.
- 17:22Yes. All right. Um so we've been uh uh before the HBC a few times here for 537 Warren Street. Um the as things are starting to sort of take shape and we've been opening up things on the inside and the outside of the building, we've found some existing window openings that we are hoping to utilize along the park. Nothing that we've nothing in this conversation today changes anything on Warren Street. This is entirely along the park.
- 17:53So, um, let me try to do this without. So, uh, in this quick render right here, you can see, uh, there are four windows in what I believe is the original part of 537 Warren Street. There's two downstairs, two upstairs. These window openings are existing window openings that were bricked up some time ago in the building. And our intent or request would be to open those openings back up and reuse those as they were historic in nature at one time. And it sort of made everyone uh feel like it was a good uh uh use. It is good. It was a good feel for the building.
- 18:33Um beyond that the addition along the back of the building which was was actually two different additions over the history of this uh building. Uh let me get to the rendering. Uh what we're proposing to do back here is this this once had much larger windows and a door back here in the back. We're proposing again to there are three high windows that are were boarded up and bricked in. We want to open those back up. And this door actually exists in that location right now on the side.
- 19:05So, it's really simplifying the window and door openings along the park. That's what we're here for today. Uh trying to uh you know, we're going to repoint. Everyone's probably walked past uh 537 Warren Street at some point in recent weeks and seen the metal tin is off the side and the brick facade is in pretty rough shape here. Uh so, we're going to repoint all of that. Um, but the goal is to uh utilize existing window openings in the brick portion of the building and then in the back part which were woodframed additions. We just want to reuse uh these three window openings. Um
- 19:46Kevin, does this pres, you know, does this prescribe you from ever doing that ambitious but beautiful project that you had in the beginning? Like are we never going to see those windows to the to the alley? There was a big door opening here on the side. That's is that where originally there was a big door and window configuration here on the side. Um that's that has since been uh removed. The client doesn't want to do that anymore. There's too much in a perfect world.
- 20:19There could have been some control. Not not control, that was a terrible word to use here. In some um scenario, the client would have loved for the park to be have been a more beautiful park and a more beautiful space to try to utilize and have the ability to put chairs out there. And it's just too much of a risk that they wouldn't be able to do that. And the wall space actually provides them room to put furniture along the walls inside here.
- 20:44We've now been working on, you know, what does the inside look like and how do you know tables and chairs and displays work in here? wall space is proving to be more valuable than glass.
- 20:56I appreciate that. Thank you. That's all I have.
- 21:02There anything else that was on the previous CFA that's not on this one? We're going to be completely voiding out the one that was already approved. Correct.
- 21:18Kevin, did you hear
- 21:18Kevin?
- 21:19I'm sorry. What' you say? Uh, uh, Officer Fox is asking, uh, does this replace your old application with this change? Um, I think we're suggesting that it does.
- 21:30Does.
- 21:31Yes. Yes. I think I think it would. Yes.
- 21:34It's not. So, it's not just the four new windows. It is a total reconfiguration of the eastern facade of the building.
- 21:42Agreed.
- 21:42Correct.
- 21:43Okay. So just to be clear, the the old CMA is going to be null and void and anything that was on that that's not on this one isn't applicable anymore.
- 21:55Well, only on the eastern side unless there's changes to the front that we haven't talked about.
- 21:59There are no changes to the Warren Street elevation
- 22:02and but those are all laid out in these plans. Also, those window replacements, correct?
- 22:09Okay. So, uh, Kevin, you'll, uh, if I'm sure you probably already have, but can you send that to, uh, uh, uh, the code enforcement and the HPC, uh, folks so that we have one application that is complete with all materialities. I I know you still you have it on the app. I'm just reminded
- 22:33we we will resend I I will resend every the application and this information we're looking at on the screen right now to uh HBC and to uh Nick uh so that everyone has the latest and final presentation application.
- 22:54Thank you folks.
- 22:56Yeah, good um motion to uh find the application.
- 23:02and all motion hearing and request all in favor. Are any running?
- 23:19Okay, you are approved, Mr. Conklin.
- 23:22Thank you again, everybody.
- 23:23Okay, sorry. Okay. Uh, and now we have a bunch of new applications. We'll start with 449 449 Warren Street. I believe our applicant is here in person.
- 23:40Jim, while you're doing that, um, I did have a question about 740 Union because I had a sign application for them. I didn't see it on the agenda. I wasn't sure if that was something
- 23:53uh 40. Oh, yes. I have it. Uh that was the the attic window.
- 24:06Oh, no. Then it wasn't 740. It was the VFW 6. The one
- 24:10Oh, that's
- 24:11336 warn.
- 24:13Yes, we we presented that.
- 24:16They assigned also she said. Oh, they did. Okay. I thought it was
- 24:21separate.
- 24:22Oh, I see. I see. Yes. I'm sorry. We did get this been a busy week.
- 24:29Crazy.
- 24:29Okay. Uh, yes, you are correct. I'm looking at it now.
- 24:34I just want to make sure it gets added to the end.
- 24:37Yes. Okay. I'll I'll add that. That is for the the gallery that we just we just approved the door. Okay. back there. But not the that Yep. So that's that little catwalk right there. It's not going on the front the face of the building. It's going on that door that sits back on the catwalk and then
- 25:06Yes.
- 25:09Okay.
- 25:13Is it one sign or two? Because this looks like two unless
- 25:19Oh, that is
- 25:20Yeah. Sign two.
- 25:21Back door.
- 25:22Oh, that's the back door.
- 25:26So, they're not too
- 25:30No.
- 25:33So, one faces toward Third Street. That's elevation B. And one faces Warren Street, which is this little uh dog here.
- 25:42Okay.
- 25:44Uh on.
- 25:47I think we should
- 25:49while we're here.
- 25:52Yes.
- 25:53Motion application.
- 25:57Uh motion to wave the public hearing
- 26:06336 336 Warren.
- 26:10So, Attorney Polydoro, we did approve the sign.
- 26:13Okay. Thank you. Uhhuh. Thank you.
- 26:16I mean, not not thank you for me, but yes, I'm glad you put it on.
- 26:21We didn't.
- 26:27Okay.
- 26:28Could we complete voting on?
- 26:30Yes.
- 26:31All in favor?
- 26:32Yeah.
- 26:34Okay. Now we are uh at 4 449. This is 449 and a half.
- 26:43Great. So, um, well, that was actually just I just want to like try and make it as clear as possible because there's two sides 432 and so um I think 432 but we were really successful. We started out for New York City and So now we have to move to a different space. So we took a lot of in business. So
- 27:37it was like a cream.
- 27:39Yeah, it was really color. But to be like clear, one of the So this original one is actually already at 432.
- 27:55It's just getting moved down the street.
- 27:57Okay. So this sign that I'm showing here is
- 28:01at our original location of 432.
- 28:03Okay. So you're moving this sign to 449.
- 28:06Yes.
- 28:07Okay. And then the fifth one from NextGen is getting re replaced but almost the exact same aesthetic as the original one
- 28:16because we want the brands to be familiar to one another.
- 28:22Same exact same
- 28:24and you're reusing the same post also, right?
- 28:30One is going to remain the same post. They're just it with the same specs, different traffic, which is very similar.
- 28:37Yeah.
- 28:37And then this one, the question that I had that NextGen said that they could do, according to your Horizon's approval, is either they can do a poll straight across here. Um, or they can do this chain length one, which is up to you guys, but this is the one that we want.
- 28:56Your preference is
- 28:59I had a question. Is that the same building on both sides that it's hooking to or is that a separate building?
- 29:05So, because Old Hudson has so many signs, we want it to be only our sign in the alleyway. So, yes,
- 29:14no, no, I get that. It's only one sign in the alleyway. My question, let me just share the screen again.
- 29:21Next, Jen wanted to hook it to both sides of the alleyway. go to both the
- 29:27I'm I'm asking if if that alleyway because it's only a picture of the doorway. Is it the same owner on both walls that you're hooking to or are you hooking to an adjacent building?
- 29:38Yeah.
- 29:43Yeah.
- 29:44So, we are hooking to an adjacent building. So, to the left with the windows, I believe is Old Hudson.
- 29:50Yes. And then to the right is uh
- 29:55447.
- 29:57So do they do Nick? Do they have permission from both building owners to hook to both buildings?
- 30:05Wait, we're just discussing here. Attorney
- 30:10Well, Dina doesn't own the building.
- 30:11Okay. Oh, I see. But um Dina has the entire week of the whole front side of the building.
- 30:20I know.
- 30:21And then she's got the
- 30:24So I was trying to be not part of business by being in
- 30:29No, that and that's just to clarify what attorney's asking. Do you have permission from the two owners of the building to do this? And I actually didn't think I should. We just need
- 30:45um if if you guys vote whether or not you approve of it, I won't release the sign permit until I know she has approval from both owners. Got it.
- 30:55You need it in writing. Yeah,
- 30:58I'm I'm okay with it.
- 30:59Yeah, if you get permission with the chain or with the with the chain, it will be like some straight as it's a welded chain.
- 31:10So, attorney Polydoro, the choice is the chain the applicant going to get in writing from both the owners of the building, whether it's Bard and somebody else or whomever, uh, that that the application of of the bracket is allowed.
- 31:29Great.
- 31:30And for the record, she's going uh with the chain uh this chain link. And uh for the record, the the sign is 36 in x 16 in.
- 31:42Okay. And uh officer said he will not release the uh sign permit until he's uh confirmed that both owners are are agreeable.
- 31:54Yeah. Okay.
- 31:56Okay.
- 31:57Okay.
- 31:57Uh the application complete.
- 32:00Amazing.
- 32:00Cara and Paul. All in favor? Motion to wave the public hearing and request uh the city attorney and Paul again. All in favor you approved both 449 and 432.
- 32:25Yes, we did.
- 32:26Yes, we did.
- 32:27Okay, great.
- 32:31Okay. Annie, you still need to get a signed permit from you. Okay.
- 32:37In in writing, I'll get from the other.
- 32:39Yeah. From both landlords that you have permission to install new building.
- 32:45Thank you.
- 32:46But not not the original.
- 32:52Thank you very much.
- 32:54Okay. Thank you. Uh, next up is 362 Warren Street. Is our applicant here? Yes.
- 33:02Yay. Okay. Would you like to uh would you mind coming up that microphone so we can
- 33:25So uh 362, would you like to tell us about your projects?
- 33:32Uh sure. Yes. So u building we're a real estate agency um and we're just making kind of necessary repairs and deferred maintenance. Uh, and this pertains to adding a a porch and stairs to the rear entry. Um, there you saw that's the fronts, of course. Um, so that's front.
- 34:00Yeah, this may be old. Um, I think you had it before.
- 34:06Oh,
- 34:06back porch. Yep. Um, so you can see the door is, you know, not there. So, we're going to install a door. And that's an example. That's current condition. Um that is the second well the ground floor um and the basement entry. So we're going to build the deck that is designed to the right there uh and affix it to the side of the building and install those stairs um and included an example of basically what the railing and stairs will look like. It's the same contractor who will be building it that built these um that was at um
- 35:03the address is 362 and it's the back
- 35:10uh and that's an example of what we and that's the interior with the door. Um, yeah. So, we're going to be installing a glass door similar to the one uh on Warren Street. Uh, it will be an exterior door that swings out. It will be. Yes. Because that's Oh, well that's the interior of the office, but it'll be that leads out to the deck. Oh. Um, I think we also submitted another application yesterday for the front. We're going to be hope to build a little Yes. this woodframe closed case to display listings.
- 36:04Can you aim the iPad at whatever you guys are looking at? just wants to add a where am I? So this so what you're looking at is 362 uh Warren Street and um in between the two windows here um they want to put a wooden frame with glass in order to display all their uh listings that they're currently displaying here in the window here. They want to put it a fix it. So we thought essentially it was a sign
- 36:48a shadow box.
- 36:49Yeah. shadow fell through in deep tempered glass be like a dark gray.
- 36:57Is there already a sign in the building?
- 37:00Uh well, there's this on the sign on the awning right now, but this is not a as as it goes. It's not actually a sign. It's a wooden frame that looks like a a a framed window, but it's not. It's glass. It's a box. It's like a shadow box. Uh, it's going to be 50 in height and 28 width and about 3 in.
- 37:2850 inch tall, 32 wide.
- 37:32I think we're going to
- 37:33How will it be a fixed? Is it like a fixed forever or is it a fixed for now?
- 37:38No, it'll be fixed for now. I mean, you know,
- 37:45on the brink they're real. They're real estate listings. Is that what that that's the purpose?
- 37:51Yes.
- 37:55And it's just, you know, simple tapcon screws that could be just filled back in with mortar.
- 38:05Yeah.
- 38:06Okay. Doesn't particularly bother me.
- 38:11Okay. So, so do we have an application for this? A separate application for this?
- 38:15Well, we're just adding this to the other application. Okay.
- 38:22Yes.
- 38:23Yes. So, the single just to restate the single application is for this rear uh deck uh with the railing. Um and this is the approximate is what is the materiality? Is it wood?
- 38:41Yeah. Pressure pressure the door.
- 38:50Um the door is going to resemble what we have.
- 38:58Yeah. No, we do not. We need that before we can
- 39:01Yeah.
- 39:02move forward.
- 39:07Yeah, we need we just need spec specs.
- 39:10Come back in two weeks. let us know what door that you're going to install. Pick one out, you know, um bring in the specs, manufacturer.
- 39:17Will we be able to like receive the that construction before we
- 39:22If you would like to do that, then you're going to have to submit another application for the door itself.
- 39:27Okay.
- 39:28Um yeah, that's up to you. Cost you an extra hundred bucks.
- 39:32Yeah, we would like to get the start working on the deck. So, okay. So, they just want you to vote on the deck and the shadow box and they will submit a new application for the back door.
- 39:48Uh, correct. So, like where the ball factory is. So, uh for the deck and shadow, all in favor in public. So, uh, officer, I'm going to need I'll need a building permit application with better, um, structural drawings on it than Okay, thanks guys.
- 40:50Thank you.
- 40:52Okay, next up is 1416 North Fourth Street.
- 40:58Sorry, I was muted. I was just asking just to be clear that did not include the door.
- 41:03Correct. They're going to apply for the door separately.
- 41:06Okay.
- 41:14Okay. Thank you. Hi everybody. Um, Walter Tadam representing the Andrew, the Hudson Public Hotel. Um, obviously we have another issue before you for the hotel. This is the annex to the north of that. And just to remind you, we came in February of last year with the proposal to take two buildings down, which we were going to replace with the new, I believe, 16 room annex to the hotel.
- 41:43Um, understandably you all denied a demolition permit to take the two houses down and as formulated a proposal that utilized the two houses. Um, we have of course done that and um we thought originally we were being so true to the existing houses to replace everything exactly as it was. windows. If there's a square window, it remain a square window.
- 42:15But new windows, Officer Fox has pointed out that because we are replacing single glazed windows with new thermally insulated windows, we need to come before you to get an approval for. So understanding that we decided to make one change which is there is a whole hodge podge of one over one two over two and a few oddball windows in these two buildings. We would like to normalize everything two over two just sharing so you can maybe help guide her.
- 42:56Sure. So, so basically this is a drawing showing the proposed demolition not of the buildings but the removal of the existing in the case of number 16 aluminum siding which is over perfectly good wood siding. We'd like to take the aluminum off and restore and replace where necessary the wood.
- 43:16Um the roofs are currently asphalt shingle and uh on 16 and some kind of old school tar flat roof on number 14. We're going to do a modified rubber roof on number 14 which will not be li visible from anywhere. Um number 16 we'd like to use the um timberline weathered wood asphalt shingle that we've used a number of times in other buildings in Hudson. It's a, you know, it's an asphalt shingle, not ideal in many ways, but it's very compatible with what's already there um in the the area.
- 43:56Well, very
- 44:03it it does. And and the roof, if I think we have photographs included in this, the existing buildings, the roof is a high enough pitch, so you really can't see what's up there. It's more a question of the color, a little bit of texture, and yes. So there, I don't know if you can see the small insert box, but there's a picture of the shingle.
- 44:21It's a reasonably good faximile when you're 100 feet away of a wood shingle hoop. Um, so and we're not proposing the house next to it in the picture. Uh, all right. So I think I've covered everything. We're going to retain the existing, we believe, historic doors, uh, entry doors. We want to close up a couple of openings at the back that are indicated in this that would not be appropriate for a hotel room.
- 44:51You know, we we have actually after a great deal of pain and suffering managed to eat uh 12 rooms out of these two buildings. Um, so so that's it. So, we have a window schedule. We have a replacement schedule for the uh siding on the north.
- 45:08There are some interesting existing historic shingles that we're going to keep. Some fish scale shingles and various things that were added to the building at some point, but they're part of the character of the buildings now. So, uh, essentially what I will say is that I think we've pretty much taken what's there now and dressed it up without changing its essential character.
- 45:40Are there any pictures of its existing condition like Windows now?
- 45:45Yes.
- 45:45Victoria, are those in the app that we could see? And Victoria is sharing for us.
- 45:49Um, yeah, let's see. at the bottom. I believe here. I thought they were I added a bunch of pictures at the end of the
- 46:02I'm scrolling. Hold on. Here we go.
- 46:07That's it. Um, that's all I have.
- 46:11Walter, can is Walter able to see what I'm sharing or No.
- 46:15Yes, that's it. Yes, that's it.
- 46:18Okay, great.
- 46:19So, uh, that's a good good slide to start with. So, that's aluminum.
- 46:25You're looking at January.
- 46:28Same thing. Same thing. Right. No worries. So, so, you know, just to point out, you you at home can't see me, but that is a two over two window there.
- 46:38Right next to it is a one over one that has a certain historic trim to it, which we're keeping. This is a one over one that has a different trim. We're keeping the trim. But in all of these instances here, you can see these are actually one over two here for some reason. I assume they've replaced the upper sack. So um to cut to the chase, we really got the idea that the uh HPC likes these buildings more or less in their current condition. They show a lot of history, a lot of changes, some very odd things like this room Canada levered over what I guess was a parking space at one point. So, we're going to keep all of that and we're going to clean up the buildings and we're going to make them habitable, nice hotel rooms.
- 47:28The only other thing I have to mention since we're
- 47:30You're going to keep that room like that, Walter?
- 47:32Yeah. Yeah, we are. Um underneath that room, uh we're required as a hotel obviously to have an accessible room in this a facility of this size. So this will be our accessible room. So we're also asking for permission and have permission from the planning board to insert an accessible ramp here. It's in the drawings with a new door here and a new door here which would go to a basement exit. Um, I'm sorry. So here, go back. Sorry, that picture. Maybe
- 48:16up, up, up, please. No, down, down, down, down, down, down. Other way.
- 48:21Here's the ramp, I think.
- 48:24So, are you enclosing the space under the can delivered room?
- 48:28No, we are not. We're leaving as it is and inserting an accessible ramp. And these are the two doors that I spoke of there. from the port street side.
- 48:52That is absolutely correct. Yeah,
- 49:00it's a it's sorry, it's um All right. If you imagine coming out in the picture plane, the ramp is underneath this overhang that we were looking at closest to me just inside the columns and it goes up to a platform that then returns and then you can't see it in this picture, but there's a little step back down that walks to an area.
- 49:27There there there is the ramp is concrete. It's at grade. It's a grade ramp, right?
- 49:35The railings are iron. That's just the minimal standard accessible railing detail with, you know, a hand. It's got a top rail, a handrail, and that bullnose return that everybody has. We did an identical ramp at the um at Kitty's.
- 49:57Does the ramp go in front of this metal pole or behind it? behind it. Behind it.
- 50:05Okay.
- 50:05Um Nick, I cannot swear that the material is listed there, but it is meant to be a concrete. It's really a continuation of a sidewalk, you know. So the this application is for the ramp those additional doors
- 50:26and if and the door and the just to make sure I understand and the changing of the windows on both
- 50:32and the siding and the roof.
- 50:35Correct. All correct.
- 50:37The new and the new sighting is going to be where there where the original sighting does not currently exist.
- 50:44So there's aluminum siding over wood. John, as is often the case, um the wood is, you know, we peeled back some siding and we see there's wood there. We can't verify that it's all in good shape, but the intention is to remove the existing aluminum and restore the wood siding underneath, which I assume is original.
- 51:04That's great.
- 51:06Okay. Can I guess the only thing that's hard and I ap this meeting is sub-optimal obviously, but is there a um I just would want to know what I understand that you want to harmonize the windows to the hotel. It makes all the sense, but these buildings exist be you know separate from the hotel. Are the w what is the condition of the windows currently? And are is there any evidence for what kind of windows would have been in this house or were
- 51:33I apologize because I know this um whole presentation is a little disjunctive but when we were looking at the photographs before um Victoria maybe we could go back to one of the photos um right so that's a good one so John uh for instance those two windows closest to us on the upper floor that's can levered out you can see there are two two sashes below that are divided. And
- 52:03Walter, that that room is not that room is not the what I'm talking about. I'm talking about the original part of the house. Maybe to the right.
- 52:08Okay. So, so there's an the cursor is on a two over two or actually a two over one window there. Uh as you go around the buildings, John, there's plenty of evidence that there were two over two windows everywhere and at various points windows were replaced with a single satch not divided. So you have a bunch of two over one, one over two. And again, it's up to you all. We'll put them back exactly as they are if you like. We're not uh we don't have a dog in that fight. But but
- 52:46two over two all the way through just to make it consist not not not with the hotel next door which is a different discussion but within the terms of these two buildings uh if you look at number 14 on the front it's two over two with a round head window with the divider. So I'm fairly confident that this started out life as two over two windows and then over the years as happens everywhere things got replaced.
- 53:23Um, what about you?
- 53:35Um, we're we're replacing doors which are noted. I don't believe we have any light fixtures noted and for the moment I think you know if there's a light on the underside of a porch. We'll leave that. We'll certainly come back to the board if we get further information on lighting. But for for the moment we were going to basically just replace fixtures in their place. If there's an outdoor porcelain light fixture we're going to replace that. We're not going to do any heavy duty lighting. Yeah.
- 54:13What kind of windows are these?
- 54:15They're Lincoln two over two insulated painted wood windows.
- 54:21They're painted wood. Okay. I don't think it does it say wood anywhere.
- 54:25Uh it says new double hung insert insulated glass. Uh Lincoln windows. Uh, it should say would and I apologize if it doesn't.
- 54:39Yeah, I don't see it but I think you know we should be specific.
- 54:46We should see we should see the spec sheet right from the manufacturer like we do with everything.
- 54:50Yeah, right.
- 55:02Victoria, can you hear me? Can you scroll up to the doors as well? Door ledges.
- 55:07Sure.
- 55:07These are the doors.
- 55:09Yeah. Is there a sufficient amount of information on those?
- 55:14No. I mean, it says panel swing door with deadbolt, but I can't tell if it's wood or fiberglass or, you know, metal. I think we want to be again, we should be specific about the materials.
- 55:26Okay. Well, I would um advocate that there there wood doors and I'll make sure that the next drawings are clarified.
- 55:37And then I had a question too because there was a a comment up here. Hold on. Let me see if I can find it again here. Let me zoom out. It says um retain, repair, and paint existing wood shingles. That's all great. But then here it says restore wood or replace with Hardy board. And so on the whole building, is it going to be hardy board or just this one side or is it because I could see replacing wood with wood as you go through if it's damaged, but that starts to get who makes this decision.
- 56:08That's what we're going to do. I think we can now emphatically state at the time that I wrote this, we hadn't really gotten an idea of what was underneath that aluminum sighting and the condition. They've taken a little off now and it appears to be in pretty good shape. You never know. So, uh, that Hardy board note no longer obtains. We're going to restore the existing wood siding and where necessary will replace it in kind.
- 56:36Okay. So, that will come off that note. post. Are they going to
- 56:50I was not planning to. We'll paint them. They are painted but rusted now. So, we'll remain unless anybody has a real issue with that. It's kind of
- 57:02It's an odd condition.
- 57:05Yeah. and
- 57:06it's an existing condition and and you know I think that we might have a landscaping solution there. We might grow some vines on them or do something. Um but yeah, for the moment we just leave it the way it is.
- 57:22And then I'm sorry if you talked about this earlier, but I just the the windows you've all speced below are all square. What is this round piece in the oval? Those are existing to remain I think. Can we look at the window schedule again? I I'm not sure what I said.
- 57:45Here it is.
- 57:48Type G type G window
- 57:53can't read that. Um that's the one that's uh two over two with a half round over. Uh yeah, retain existing character, lowar glass, Lincoln uh windows, brass hardware. So if we can, Victoria, we will repair those round windows above. We're not asking permission at this point to replace them. Some of them have a kind of shutter over them. Uh so this
- 58:21arch is going to stay,
- 58:24correct? So can you make a note on the plan set that says up here wherever wherever that was existing you know existing to remain here boop existing to remain right so it's clear we all know okay
- 58:38yeah and if we in the process of working on them find that there's a problem we will replace them the match to exist
- 58:52same with the door with the transom over here.
- 58:56Correct.
- 58:56Existing to remain.
- 59:00All right. I think these notes help everyone. They help the contractors when they look at the plans. They help Nick. Now, is the board satisfied with the trim? Do you need dimensions on the trim around the windows?
- 59:26I I believe most of that is existing or in a case where a window is missing its trim, it would match the adjacent existing trim. I mean, you can see we've gone through there are some I'm not sure what the technical term is. Some of the trim has little ears at the top and the bottom and we're going to leave those in place. And then anything that doesn't have that generally has a plain stock trim around it. And in the case where there are windows that are untrimmed, we would trim those with the plain stock to match.
- 1:00:08Okay. I mean, I Nick, it's your call. I I think the trim should be dimensioned because you can imagine different people, you know, have different ideas of what it should look like. So I that would be my recommendation butification.
- 1:01:05I think we we lost you guys.
- 1:01:08Oh, here. Sorry, Victoria. I uh told Walter that we need more details about the windows, more details about the doors, more details about the window trim, more details about the ramp and railing. Um and Phil was things uh asking is this can be preserved and so on that should also be on the plans in writing.
- 1:01:38Yeah. Uh, I'm I'm not sure we're actually even close to
- 1:02:00So, we're asking them to return with more specifications. Correct. Okay. Thank you very Thank you.
- 1:02:37Morning. I'm with Rodriguez Builders and we are looking to remove that U we're looking to remove that overhead walk or that catwalk as we refer to it. It's uh the house is from 1928 and this is probably from the 60s or so as you can appreciate. It's starting to spool pretty bad. And uh now at this point there has been chunks of concrete that are just falling off. But so one is not original. too. It's uh not safe and the homeowner is looking to remove it completely and complete the wall with just stuckle all the way to the bottom. building it wasn't flat water deteriorating and even repairs continue to deteriorate also.
- 1:03:58That's right. Yeah. So, everything stays except uh the catwalk and the the railing. That's actually not even close to code. No, just uh we just want a plain wall as as we uh as we would just bring the stuckle all the way down to the bottom. Those are garage bays. Yes. Yep.
- 1:05:15Victoria, um, application has been approved and they want you to prepare a CFA. I can't hear you now.
- 1:05:27Oh, you're muted, Victoria.
- 1:05:29Thank you. Sorry. Uh, I thank you. Uh, but what was the address for that? or Rossman.
- 1:05:37Okay, I see a paper. Thank you.
- 1:05:41Thank you. Be safe.
- 1:05:45Next is 453 East. That is for someone be able to share it.
- 1:06:02I can actually share for our firm. Um, if you allow me to
- 1:06:05Thank you. That would be helpful. I appreciate it.
- 1:06:17Is everyone online seeing my screen?
- 1:06:20Yes.
- 1:06:20Yes. Thank you so much.
- 1:06:22Thank you. Uh, Doug should be there in person presenting as well.
- 1:06:26Yes. Thank you. Uh, so we were here. I'm Doug Huntington with Barless Woodland Architect. came before the board in March of this year to get uh a window replacement and a rear deck addition approved. So, we are coming back today to look at uh a roof replacement and some repairs to the to the front porch that are needed and to give you a couple of updates from our our previous application. So, I think uh you're probably familiar with the site there on East Allen Street. Uh go ahead and flip to the next page.
- 1:07:11So, this was the site plan that was previously approved at the last meeting showing that extension in the rear uh for the deck. Going right ahead the next one. And then so we'll we'll zoom in here and look at the front porch here, but that's really the area in terms of the site uh building area that we're that we're looking at.
- 1:07:34Go ahead the next one. So So we'll get into some of these porch details uh a little closer because some of them have started to deteriorate quite a bit. But one one element that we are uh wanting to remove is that second floor railing that is above the above the front entry porch. And we the f only his historical photos we could find going back uh to or were back to to 2015 where you can see that railing design had had changed from its current condition. And so I think we we feel that that railing was probably not original because there there's kind of its cousin house next door that uh has similar porch details with that bay window above and does not have a railing there. You know that the bay window there's no real functional uh reason for that railing to be there. It's just in front of a few bay windows that are in front of the where there is currently a bathroom, but we'll come back to that here in a minute.
- 1:08:52But, uh, if we go the to the next slide. So, the main areas for the porch that we're going to look at as replacing the the steps in the front, uh, which are are certainly not original to to the home and are, uh, do not have a not have a railing on them currently, so not to code. And, uh, the client wants to to to to put in a railing to just for for safety and aging in place. So we we'll also be looking at the columns in detail here. They've significantly deteriorated. So we're planning to replace those in kind with new columns and then uh and then finish the roof with uh plant.
- 1:09:47Can can I ask a question? I'm so sorry. I hope I'm not talking over anyone. Is is this different from what we looked at this house recently, right? Is this different from what was proposed?
- 1:09:57Th this this is some new new scope that was not in the original application. So the the porch repairs is new and then what you're going to see here in a moment for the roof replacement is is new new scope that was not approved in the original application.
- 1:10:15Okay. It would it's just super helpful to call out what we've already approved and what we haven't so we don't have to rethink the whole thing. Thank you.
- 1:10:22Yes. Yeah. You'll you'll see that coming up here hopefully and be a little clear here too. But go ahead and flip to the the next page. So for the roof replacement, uh you know, we we actually when we came to the board originally, we were showing a standing seam metal roof for the whole project and we've done went back and did some research and and tested a few different options and and the client has landed on replacing the existing asphalt roof with uh a uh a new asphalt roof with a diamond shaped pattern. So there there's similar asphalt uh shaped roofs on Allen Street currently and honestly it was very difficult to find diamond shaped but
- 1:11:14nobody makes it anymore. There's one one company left in the in the US that we were able to find that the stomach yeah cascade um shingle that Peter gray color that is so and then then we'll also there are two kind of accent elements that you'll see in the elevations that we are going to use a a standing seam metal roof
- 1:11:40are the accent are the accent are the accent standing seams I'll wait. You're going to show this to where you're going to use those, right?
- 1:11:49Elevations here on the next pages. Yep. So, this was the previously approved uh front elevation here with no changes shown to the front porch, but the window replacement that we that we had we had discussed at that time. And then if you flip to the next page here, you'll see the changes to the porch that we're talking about here. So, and and we have some zoom in details here coming up. So, the but showing the new asphalt roof above a flat seam metal roof above the porch. Uh replacing those wood columns in kind and adding a some stone steps and uh a painted metal railing on the the lower the lower section to replace those steps. And and you'll see there's
- 1:12:38some more uh details here to come in some future slides. Let me flip to the next page here. So, this was previously approved. No real changes were made here. If you go to the next slide, except we, you know, we did make some revisions to the railing uh design on that stair in the rear that's going up. So, that was a little bit more ornate to kind of stake to be more true to the Victorian uh style. And then you can see the area that in the rear that over that existing partial edi existing edition and our deck extension where the the standing seam metal is going to to be on that section in the back and and a little bit
- 1:13:25in the front that you'll you saw from the from the other elevation. So, previously approved east elevation here and and you'll see on the next slide uh through the demolition of the interior, we've there were some existing framed openings for windows that uh the owner wanted to to uh bring back to life. So there are four windows that we wanted to add on this east elevation uh that will be the same as the windows that we previously had approved but uh it was just through demolition that we found those framed openings into the design.
- 1:14:16So no other changes there. You can see the asphalt roof
- 1:14:21and you have the specs in in here for for in the plan in the submission.
- 1:14:27I'm sorry.
- 1:14:28The window specs.
- 1:14:32I believe they were including
- 1:14:33we approved them already.
- 1:14:35But
- 1:14:35yeah, but he's adding four now.
- 1:14:41The intention is for them to match what we had previously approved. I think she just wants I think we just want to I think we want to make sure that you if when you since you're even though they're the same as the others, would you please attach the spec when you get a chance?
- 1:14:56Thank you. Can I ask you a question? Why did you choose the what did you choose the diamond shaped asphalt roof because it's more in keeping with what could have originally been there or did you have evidence that there was a diamond shaped roof there or did you just like it? Uh well, there are a few others diamond shapes on the block on some neighboring properties
- 1:15:19and the current is just a standard uh kind of rectangular shape and and I think we we when we heard the board's feedback at the original meeting about the standing seam, we just we wanted we had test we we just we thought that this type of a shingle would just be more in keeping with
- 1:15:40with the kind of Victorian Stop.
- 1:15:42I think it is. It looks really cool.
- 1:15:44I think it's great.
- 1:15:45I wish I'd known about it. It's great.
- 1:15:51Uh, all right. So, next slide here. So, we'll zoom into the railing uh the porch design here, but I think what we're proposing is kind of a stone steps with a simple metal railing that'll allow the original details of the porch to remain and then just kind of integrating uh a code compliant railing in and and removing the the the current wood steps.
- 1:16:19So, next slide. Uh just a plan and kind of section of how that work how that works. You can see the metal rail kind of slides inside of that existing wood ballister railing that that's on either side of of the porch. And uh and so again trying to to retain as many of those existing details possible. That's right. And put in It'll be a concrete structure with uh stone clad in in stone. We're thinking it's going to be granite granite stone.
- 1:17:12So, you can see here in some of the photos the columns that are sagging and leaning a little bit. the bases of those have have really started to disintegrate. So, the existing porch right now is sagging a little bit. They have some temporary shoring kind of underneath that until we've been able to get this approved and allow the some repairs to take place.
- 1:17:36But the idea for the columns is we've we have found a company that will uh turn and replicate those columns as they are in pressuret treated and pressuret treated wood. So the idea is to replace those in in kind. And then uh a few other modifications to the front door. Uh we want to replace the existing glass which is just a single pane unit with a laminated glass just for a little extra security. And the client would like to to do a little etching of the address in that glass just to add a little bit
- 1:18:22clear
- 1:18:26and I think I think there's one more page which is just you can see the existing storm door is kind of this just stained uh wood, very plain screen door, and we want to add a a storm door with a few more details to it. Victorian qualities of the house. So, I think that that's kind of our presentation. Happy to answer any questions.
- 1:19:05Sure. Kristen, will you flip back to the elevations to look at?
- 1:19:14So, the front the front porch there will have a little standing seam above it. It's actually be flat a flat seam because it's a very low slope. So, want to uh but it'll be a metal a metal roof. And then if you go back to the the east and west elevations, So, it's just this section in the rear that will have a standing seam metal roof and then the rest of the the rest of the roof it's going to be as small just those two.
- 1:20:01I think it's going to be custom. I don't think
- 1:20:18Yes. Here I go.
- 1:21:01Application is approved and city attorney may prepare a CFA.
- 1:21:10We couldn't hear what was said
- 1:21:14of what part of it?
- 1:21:17Uh the application has been approved.
- 1:21:19I'm sorry. I had my hand raised and
- 1:21:23Okay. And I I wanted to speak to this because there are a few things the applicant is mistaken about.
- 1:21:36I I don't know if I'm allowed to speak or not.
- 1:21:40That he's right. His hand was raised. Um
- 1:21:47Mr. McGee.
- 1:21:48Yes. Would you like to uh share with the applicant your concerns?
- 1:21:55Yes. Uh his statement that the porch is sagging is is a mistaken concept. The porch is actually deliberately angled at the top there where the railing goes around to drain the water off. Uh, I photographed this house extensively on February 9th, 2024 when it was before the council. I mean the the landmarks and I have to say that the railing up there is historic fabric and it's really quite beautiful and in the sunlight it's rather amazing and I it should be preserved and frankly I don't see a real problem with the columns that they need to be replaced.
- 1:22:55The two on the left of the right side are deliberately shorter than the two on the left in order to slope the roof for drainage of the porch at a porch roof which has got that railing around it. and and looking at these images, there's really almost nothing in the matter with most of the posts there. The the one image they showed the base of that could just be replaced. I think it's it's uh excessive.
- 1:23:37And in the photograph, it looks like, I'm not sure if it's the case, but the window on the uh door may be beveled. I'm not sure, but I I still think that there's it shouldn't be so radically redone. The dentals have been removed. in the image they show later on that they wanted what they want to do to restore it. I think it should just be restored as it is and if there's any rotted wood it can be replaced. Thank you.
- 1:24:24Thank you. M is that correct that the dentals are removal as part of this?
- 1:24:31No.
- 1:24:33No.
- 1:24:33No. I I don't
- 1:24:39Go say it. Say what you said.
- 1:24:43It has no dentals on the drawing.
- 1:24:48If there's any that have been removed, they'll be replaced.
- 1:24:53Uh in any case, I I think the commission should look at this more closely. Thank you.
- 1:25:25Okay. Victoria prepar.
- 1:25:29Okay. as discussed the what you've already voted on. Okay.
- 1:25:34Yes.
- 1:25:35So, just for the
- 1:25:36it's a really thoughtful presentation. Thank you.
- 1:25:40Oh, my camera's on
- 1:25:48next street. That's crescent. I don't know what happened.
- 1:26:00You guys can still hear me, right?
- 1:26:01Can it's just hard when you if anyone speaks far away from the iPad, we generally can't hear it.
- 1:26:12Okay. Um I don't know, but as long as it's still working as a microphone, go for it.
- 1:26:23Hello, commission. returning with a previously approved project at 750 752 Warren Street. Um it was determined that to meet the New York State Energy Code, the amount of insulation that we are required to add to the roof, the existing roof uh won't allow for enough detail for flashing up the parapit. And we need to add a few courses of brick to the existing building to maintain the flashing details so that we don't uh risk water damage into the building. Uh so what we propose is removing the existing parapit cap, adding three courses of brick uh to match the existing brick and replacing the existing parapit cap.
- 1:27:14Can anyone show us a picture online?
- 1:27:17Yeah, I can pull it up. I think we got this one.
- 1:27:22What do the three rows of brick back Everything's gonna match
- 1:27:32existing
- 1:27:33existing. So on the west side of the building, it's a regular red brick and uh we have some uh openings that we're demoing inside the building. So we'll be able to replace that with a matching brick. And on the face of the building, uh we were able to find a replacement brick that matches the existing brick.
- 1:27:55Are we on the right screen here?
- 1:27:57That's a great view. If you're able to scroll up just a little bit so we can see the top edge of the parapit.
- 1:28:04Okay. So up here. So the only change is the this thing in the cloud. Remove existing coping at 3/4 8 in of brick.
- 1:28:12Correct.
- 1:28:14Okay.
- 1:28:17And the only reason we're doing it is to allow for insulation to meet the energy code.
- 1:28:25What's the coping look like now? Uh there's actually two different copings. On the west side, it's kind of a terracotta um cap and the one on the face is more of a square cap. But we'll
- 1:28:40Can we see Can we see pictures of what will be lost?
- 1:28:44It's we're replacing the the we're removing the the coping cap, adding three quarts of brick, and placing the existing cap on top of the three course.
- 1:28:54Oh. So the the parap.
- 1:28:56So you're just raising it. You're just making it like you're just making raising it three bricks higher.
- 1:29:00Three bricks higher, but the the details still be the same.
- 1:29:03Yeah.
- 1:29:03Oh, okay. Thanks. I'm fine with that.
- 1:29:09What will be the How will you match the I mean, you won't be able to match the brick, right?
- 1:29:13Uh we're actually able to find the same brick. I mean, the color is a little bit different because obviously the the brick that's been there is aged. Um but there is a color chart. So, we found one that is a very close match.
- 1:29:25Wow, that's awesome. Thank you.
- 1:29:45Application approved. City attorney prepare a CFA. Um, we have Henry Hadad here who's been waiting very patiently. Uh, his application got mixed up. I emailed it to you getting here. Uh, he simply just wants to add a back porch onto one
- 1:30:07What's the address?
- 1:30:09116 Union Street.
- 1:30:14I sent it on October 8th, it looks like. What happened? Microphone is all yours. They can't hear you back there up here.
- 1:30:28Yeah. Um so we did we I tore a porch off of it originally when I started working on the house. It was about it was three stories and um an auxiliary room and it crushed both of the roof lines. So, I removed it and instead of that goddy porch, I would like to put a porch that um mirrors both of my neighbors porches. Um maybe a tiny bit smaller. Same design. Um simple construction. Uh cedar decking and cedar rail square stock. Very simple. Uh there is a cut sheet of it in the original application and there is a picture on the one you're looking at.
- 1:31:25This is an addendum I believe to an old application.
- 1:31:28I had the porch on it but we did not have approved porch design.
- 1:31:34What do you think? So, what we're looking at, you would be extending the railing across this.
- 1:31:41Yep, that is extended. You uh just have to zoom in and look at the little cut zigzag.
- 1:31:49Uh you have seen the rendering of this a few times already. This is just a detailed drawing of the porch. Um so, you know what materials and finishes simple porch. Um, he either decking everything wrapped in everything else wrapped in life pan life span fine. Everything looks like it's u going to be built to code. I mean, I don't see the extension of the railing, but I I defer.
- 1:32:39It's that line that's broken. Uh, Victoria, you see there's like a Z in it. It just means that it's repeated to the left. So, if you zoom in
- 1:32:47Oh,
- 1:32:50and scroll to your right and then down a little bit.
- 1:32:54This
- 1:32:55Yep. That little zigzag thing is meant to be the Okay.
- 1:33:00Extend it. Do we need better specs for this?
- 1:33:11If Nick, if Nick understands it,
- 1:33:14over it with me. That's why we wrote everything in on the bottom with the materials we're going to be made of and everything like that. Um I think it's pretty clear um from code's perspective how it's intended to be built um based on um the plans that we have there and the material list that we have added to those plans as well.
- 1:33:36Okay.
- 1:33:37Great.
- 1:33:38Great. application approved. City attorney prepares CFA.
- 1:34:06And that concludes the the new CFA. Uh we now have discussion on two properties 402 404 345.
- 1:34:23Jan, it's a bit hard to hear you. If you could stand closer to the iPad, that would be great. We just have uh per the agenda we just have that that concludes the CFAs uh for the meeting. We have two uh discussion points this morning. 402 404 Warren Street, the Hudson public. Our applicants are here in person and we also have 345 Union Street which is really uh Officer Fox wanted to give us an update on that.
- 1:34:52Okay. Remind me what? 3:45.
- 1:34:55It's the blue building next to the Quaker meeting house.
- 1:34:58Yeah, we talked about that one um a little bit after the meeting. Yes. Lola, the last meeting um where they took off all the siding. The framing's in really bad shape. Um after talking with our attorney and their engineer and everything, um they said they're planning to rebuild it, stabilize it better.
- 1:35:18Um the engineer um from Taconic Engineering is supposed to get them plans on how to do so by the middle of November. Um but I've told them that um if anything changes um in either the like if the structure is compromised any further between now and then or the we have a bad winter storm approaching which could compromise the structure then the city might have to take action to protect public safety. um up to and including demolition of the rear of the building.
- 1:36:07It is very much in trouble at this point. Um and my fear would be if we get a big enough snowstorm that the rear of the building is going to collapse. So front of the building, the brick building, the original structure is in good shape. It has good bones.
- 1:36:24It's all of the additions after additions after additions that have been added on to this structure that have no foundation, very poor quality workmanship as far as the framing. Um, and that needs to be redone. Um, unfortunately, like to reiterate, the engineer is not able to get us plans to make these repairs until the middle of November. Um, so if at any point it becomes a danger to public safety, we'll do what we have to do to protect the public while trying to preserve the original historic building.
- 1:37:22So you see uh the this is but the additions are not all right. Um
- 1:37:32the pictures open back and everything. Can you scroll down Kim?
- 1:37:37Sorry you guys can't see this online. Yeah. All of that all of that is really bad. All of the siding and sheathing has been taken off since then and um is
- 1:37:52in some spots there's nothing.
- 1:37:54Can you show that?
- 1:37:55My lost video at this point. Okay. We're just living on a prayer.
- 1:37:59Okay.
- 1:38:01So, this shows the siding having been removed.
- 1:38:04Yeah. They took off all the siding. They took off all the sheathing. Uh there's some, you know, diagonal bracing to hold the framing in place the best it can. Um but it's it's it's hodge podgeed as could ever be. And and then the west side of the building is just gone. It's just rotted away.
- 1:38:29Yeah. It's just kind of floating there somehow. It's living on a prayer as well. Yeah. I see you can see the rot there from that down spout when they took that off. Everything right there. You can even see it's kind of sinking here.
- 1:38:45So now all of that um siding and everything that you know does kind of hold everything together is gone. And they put some bracing up to stabilize it temporarily for now. But you know with no the the sheathing does give a a good amount of structural rigidity to it. So now that it is just rotten framing kind of holding everything together, it's just it's
- 1:39:19Yeah. Um that's the plan is that they want to um support the second floor floor and support the roof and replace the framing and foundation where needed. Um that's what they want to do. Yeah. Yes, absolutely. Hopefully we we get there, you know, and it gets better supported sooner and it's a light winter.
- 1:40:09Okay. And uh finally, we have a discussion about 402 404 Warren Street. Okay. I don't think there's a it's on the agenda in case the applicant want to talk about it.
- 1:40:29Uh on the possibility that uh we've had an opportunity as a commission to absorb uh all the public comment uh and I I don't mean uh light-hearted stuff. uh there are a couple people who work really hard uh to provide detailed comment and it it takes time to absorb uh I I don't want to uh assume or for you guys to assume that because there is a public comment therefore uh we agree or disagree.
- 1:41:04Uh not the point. uh just trying to be respectful uh of the folks who've who've put time and thought into it uh and uh really mostly give Karen an opportunity to uh take in everything that's come in uh and advise us uh from uh architect point of view uh what what the best next steps are
- 1:41:39uh let me pass you the magic microphone.
- 1:41:43So from my perspective it's kind of I need a little clarification. I did look into this thanks yesterday. Um but I am not sure what the next steps are from like approvals like because it's been so many submissions, right?
- 1:41:59So, I've looked at the proposed design and looked at historic photographs and looked at the windows and looked at Matt McGee's Hello, Mr. McGee. Um, his his comments and tried to um and then also looked at a lot of preservation briefs, but there's actually one that I found very applicable that has to do with preserving storefronts. Uh so like my question is just what do we need? What do I need to get feedback? I can get feedback on a lot of stuff.
- 1:42:36Yeah, I think at this point um it seems like it's the commission's current to do as we normally do as we allocation the items that have been presented to you. Um
- 1:42:53Okay. So I can I can give just so I I dug into this um looked at historic photos um looked at the work that Walter's done appreciate obviously as an architect the work that he's had to do um and also like the the marble fac um my takeaways were interesting one um and not shocking but when I looked in detail and looked specifically at national parks preservation briefs that give guidance for the different sections um the it's very clear that the top of the building like it goes back to that 1880 sort of where there's none of the molding up at the top none of the um that it's very straightforward. So I feel like I think Matt Geese suggested that that that had been eliminated but according to the photographs it's actually it's that was added on and historically it shouldn't be there.
- 1:43:45Um, I think that the windows, um, they according to that 1880s photo, uh, I do not see evidence that they're six over six. They look like they were two over two. Um, do do you are there different photos? Because I from my my perspective, it would just be just Well, let me just say whatever those the photos say is what I'm going by. I'm not bringing any like personal judgment into it. No, no, I'm just saying I have photos behind you there with
- 1:44:20From 1880.
- 1:44:22Yeah.
- 1:44:23Okay. In which case then that that's my I'm not making a judgment call as much as
- 1:44:28Yeah.
- 1:44:28I didn't see
- 1:44:36It looks like it's preconstruction though, but I just it's all the same.
- 1:44:40That's interesting. I mean Yeah. So I feel like the issue with all these is that it's not subjective like what what 6 over6 or two over two like we need to have it based on evidence of photographic or otherwise.
- 1:44:57Yeah. Um, and all I had when I was looking at this the 1880s and it's very blurry mentor Paul. Um, and it's hard to read the penistration.
- 1:45:10And it's fine if even if if you guys decide that you're buying it's
- 1:45:16I mean I have a couple other issues though like I I am and I think part of it is just confusing but there's that additional building that was separate, right? That was an additional like that. The way that it's been blended into the facade feels like it's a major break from preservation typically where you're usually not supposed to imply like continuity. You're usually supposed to show difference. So the fact that it's been bricked over and the facade continues um it changes the the rhythm of the facade, it changes the rhythm of the street pretty street.
- 1:45:51Um, and I wasn't sure because I think it also goes way before my involvement, but just that that was a break from my understanding of what the building should be doing to preserve historic accuracy. Um, the on the other hand, where I landed uh sympathetically was with the actual marble facade. Um, but this is also back to the 1880s and looking at probably had six different eras of photographs from 1880s, 1920s, 1940s, 1960s. And the the storefront level changed all the time.
- 1:46:34And so from my perspective, there's a there's more of a leniency from what that level should look like. And also I would say the national parks agrees with or I agree with the national parks who recommends that that's the approach that's sympathetic to the fact that store levels change regularly and that that could become part of the DNA. Um, the like I'd say that the the marble facade is I think falls a little bit into a subjective area in terms of whether um like there's it doesn't necessarily look like that's what was historically there. Um
- 1:47:17I I think what we're reacting to with the destruction of material,
- 1:47:22Right? So I think and but I think that the
- 1:47:24We may even be overreacting to that but if you look at the preservation is that that's a no no for
- 1:47:32Well the I'd say the no no was hey you guys can you guys cut it off? What are you what's going on? I can't talk. I'm distracted. Okay. Um, I feel like the like the official way that these things are supposed to happen that when they take it take off the um building sighting and they see the marble pieces that's supposed to be documented and shared like there's a element of just documentation to then give direction to that and that piece of it was not kind of executed.
- 1:48:10So he saved it which I think was the right thing to do. I think incorporating that into the um design of the interior or is is acceptable from my perspective and
- 1:48:27It should have been a conversation.
- 1:48:29Yeah. Yeah. There's there's a process that was that was missing. But I think Nick has also done a great job in terms of really like reigning in the process. Yeah, sure.
- 1:48:46Um, I mean my I'd say back to Nick, I think what's great honestly is how you've really become very sharp about what needs to be in the documentation for your enforcement purposes because looking through the layers of these applications was mindn numbing yesterday. I wanted to shoot somebody. Walter need to be clearer.
- 1:49:10Um, but after kind of combing through things carefully, looking at precedents, looking at preservation rules and governance, that's sort of where I landed was using that 1880s photo as a way to advise on what was historically appropriate. Um, from my eye, it didn't look like there were six over six in that. Um, and the preservation literature literally says you can't be presumptuous about that. Like you can't have it be a opinion, but you're uncovering it is interesting. The only piece for me would be is there's other photographs from that time period that the Yeah.
- 1:50:08And I also I don't want to contradict Mr. McGee if he has documentation from the 1880s of of 6 over6. Um my my feedback is literally having to do looking objectively at old photo of the building, oldest photo I could find, oldest old Paul could find. and comparing it with the other recommendations. Just stay objective. Yeah.
- 1:50:36Yeah.
- 1:50:36There there are two questions online just so everyone knows at some point when there's a pausing when there's a moment to pause.
- 1:50:43Well, we're addressing now. Go ahead.
- 1:50:50Well, one of them is me though. So So is is that what you mean, Jeremy? There's two hands raised. Yes.
- 1:50:56Okay.
- 1:50:58So, let me know when I can let me know when I have a moment. It is this is super suboptimal, but it the the it's obviously important. So, I want to speak.
- 1:51:06Well, go John.
- 1:51:09I I I guess the question is can we articulate really concisely we're because it's very hard to follow from where we are. The question is can we somehow approve is it just the windows or are we also dealing with the the the facade level and the theory is to by by coming to some resolution on this. I think Walter opened with the the the will allow them to proceed with work to shore up the to continue with the building project and shore up the the building for the winter. Is that was is that accurate? No, he Walter didn't say anything.
- 1:51:48Oh, that was a different building. I'm sorry. It's really All right. Then what I'm going to say is Cara, I I totally hear you and I understand I really do respect and understand the nature of those of those preservation guidelines. But when I see the 1866 picture and I see how much of it was remained to us, I think it's a real tragedy that we didn't proceed with the restoration. that's as close to that as possible.
- 1:52:16So I do think that what has been proposed at least is approximating that if we have an opinion on that and that's on the storefront. So I think that 1866 picture which keeps popping up and I appreciate whoever's shown all these uh shown it I appreciate that but that still I still from my perspective that should still be a touchstone for what this committee um approves.
- 1:52:34The second thing I would say is I'm not sure what's being what's being proposed on the windows. I think it's whether it's 6 over six or two over two. I would be very interested in any historic evidence that shows what windows what window what windows were there or what what formation of windows were there because I think that would also guide my opinion about what we should what should be done.
- 1:53:00Yeah. So, John, that was one of my issues is that from that 1866 photo, you can't really tell.
- 1:53:06You can't really tell. I mean, I have I have a hard time seeing it. So,
- 1:53:10it's the shutters, I think. Right.
- 1:53:15I don't know. Actually, I think you can see that there's two over two if you keep
- 1:53:20told John.
- 1:53:21No, that's the center of the shutters. I I I take that back.
- 1:53:25So, I I No, no, nobody should be sorry. I I I've got a a thought about moving forward, which is I think what everybody wants to do. And there there's sort of two sets of issues. uh how do we repair uh what may be mistakes uh and are certainly violations in the sense that it appears that the applicant basically ignored the CFA uh to a great extent uh that's really a a code issue to a great extent that it's officer Fox has latitude for example uh of uh imposing fines or etc. uh associated with the the violation of a code or multiple violations of a code and b or maybe this should be a how do we set this right uh so that there's a a straight up process in place
- 1:54:32my suggestion and folks can agree disagree what whatever you all want to do is that we workshop this a bit at least to the other meeting. My wish and again maybe nobody wants to do it is that uh Walter and Cara sit down together and sort out a plan uh that we can work with, turn that into paper so that we can review it uh and uh we try to move forward uh at the next meeting. I don't know how to do it otherwise. There's a lot.
- 1:55:16But Phil, I would also recommend that whatever comes out of that whatever proposal, it's almost like we're going back to the beginning that we get some input. We get some input from the public on this and perhaps another public hearing. such an enormous undertaking.
- 1:55:29Another public hearing on what is actually being proposed instead of the now that now that we're starting from scratch that a public hearing be re um reconvened and so that we can hear from people.
- 1:55:43Sure. We we can always do that. But let's start with what are we presenting to the public and is it something that the preservation commission and the applicant can believe in and then we can go from there and see what input we get. Walter, how would you feel about work? Well, Cara, how would you feel? Could you all work together a bit on this so we have a single document?
- 1:56:13Yeah. Oh,
- 1:56:16no. Thinking about it from legal standpoint, they if we just had a public hearing on it on the shoulder in my view, I don't have a public hearing. We had a public hearing because we thought we had an application. The uh the applicant as I understood it did not follow anything or much of anything or maybe I understand.
- 1:56:56I'm so I'm just I guess I'm unfamiliar with the this part of the process. So does that mean we're making this up right now?
- 1:57:03Are we denying the application that went to the public hearing and we're starting over again? I think that we got new information from public here and they're not denying it.
- 1:57:14Victoria looks like Victoria's trying to talk.
- 1:57:20Okay. Hi. Sorry. I I don't think we've received any new information since the public hearing was closed. I don't think you've spoken about the the project. So, I do think it's appropriate for the members to weigh in on what you heard and if you need something amended, you know, then they can come back and if it warrants a new hearing because it's a substantial change, that's fine. But
- 1:57:46right now,
- 1:57:48yeah,
- 1:57:49it it's not a matter of what we heard in the public hearing uh as the limit or scope of the input. Subsequent that public hearing, we got a significant amount of stuff in writing.
- 1:58:09Mhm.
- 1:58:10Uh uh from from uh from Matt and and and Ron and so on that we need time to absorb as part of getting information from the public to make this process work. And I don't think that's absorbed. I don't think the commissioners have reviewed everything that's come in, including what came in, I think yesterday, in terms of a series of frames. I don't think the commission has absorbed uh what Carara has been working through in terms of history.
- 1:58:48Uh so I I I don't particularly want to vote on anything right now.
- 1:58:53Oh, I wasn't asking you to vote on anything. Um, I I thought Nick asked what the process was, but again, we're
- 1:59:02I I think I think the process is to uh I'm suggesting a process. I don't know whether you heard it or not. My suggestion is that Carara and Walter sort out the input, including the materials that came in writing this week. and that we go back to another meeting with essentially a new application.
- 1:59:46Everything.
- 1:59:48Oh, it's good.
- 1:59:49No, I'm not saying that. I'm just trying to understand what you
- 1:59:55I'm I'm recommending that that new applicate, whatever the hell we want to call it. I I I think that there's a ton of stuff coming at us. Some of it may be irrelevant. Some of it may be very useful and informative. Uh I I want to be sure we give it its due. And I don't know how else to do it. And I don't think
- 2:00:20confusion is application. I think you mean submission, right? A new because we haven't closed the current pending application. So, you're you're actually talking about new plans or new renderings.
- 2:00:36I'm sorry.
- 2:00:38Sure. This is the magic piece.
- 2:00:43Thanks.
- 2:00:44Good one. Charlie got but white men Asherman and Hannah. Um, completely understand what you're saying and and the process. Um, I certainly understand you don't want everything hanging on you. Um, what I might suggest is that we have a meeting with Walter um to discuss some potentials, right? Some potential mitigation to correct errors that have been done, misgivings with the certificate of appropriateness in the first place. and then maybe at the next meeting um that is presented to the entire board so for a more deliberate discussion on what additional mitigation could be. So
- 2:01:26yeah, and I and I would just ask for the next meeting when we're able to talk about what mitigation could go in, what the board or the commission is happy with, what they're not happy with, that we come to that next meeting because we're hungry for comments. Um because we want to address those comments. Um so I I think that sounds like a good process. We did hear some comments today that are helpful related to the windows. Um, previously I went back to 2003, uh, watched videos that I could, went to meeting minutes to see what the intent of the original, what's that?
- 2:02:01That's I do it five days a week, sometimes on Saturdays and Sundays.
- 2:02:06Um, and I do think there, you know, there was a concept level approval of those windows in 2023. It's very clear from the minutes. Um, the I know you don't want to hear an attorney say this, but two over two windows was on the plans. was discussed in the minutes. Um, Mr. Chairman, I understand what you said, but I do want to remind the board, we're not looking at this as a brand new project. We are looking at the modifications that have occurred through a series of mistakes and misgivings and that's what has changed. To the extent it has changed other architectural thoughts around the building, that's certainly worth a discussion.
- 2:02:44Um, I also just want to remind the board that yes, there were changes made from the original CFA, but one of your review standards is not retribution. You're not an enforcement agency. That's what Officer Fox is for.
- 2:03:01Um, so if we could keep this going forward, looking at at mitigation, that would be incredibly helpful. We have a construction team that's looking to to continue here. Um so we can kind of keep in the back of our mind there is an economic uh development part of this
- 2:03:23you want to present.
- 2:03:25So we have we were at the last we left the last meeting asking for your comments. What are your comments so that we can address what your concerns are. Um, I think we have some more factual investigations to do related to historic windows. Um, we can certainly do that on our end. I think that the meeting is a great idea. That will give us some understanding of what the concerns are, but we can't address your concerns if we don't know what they are.
- 2:03:55May I just make a very brief statement? Sorry. Um, I understand Mr. Copniki's concerns completely. Um, we've disagreed with things before, but I do want to say this unequivocably that in February 2023, we came before the board with a very different design than the one that we have now. That design went through your process and as a result of that process, we agreed to make a significant number of changes. We didn't have the marble colonade.
- 2:04:29Everything was different. Basically, I'm going to call it a Victorian scheme. We worked with the board very carefully, listened to all of the concerns. There was a public hearing at the time of speak at that time. We came out of that meeting with the design that I thought we were building. Now, I'm as disappointed as the board is that the design was not followed. But it's not that it was ignored.
- 2:04:58Mistakes were made. Modifications were made. The colonade is no longer the, as Mr. Papiki said, the elegant rhythmic thing that it was. Um, the corrugated metal siding color was changed, but there were always two over two windows. And that was worked out with this board after a lot of thought. And I remember specific things like the slurry wash brick because there was at the time another project that had slurry wash brick and everybody was excited about it. My point is just this. We feel that we have done what the board asked and that the design that we have now oral is a result of a long process that we went through with you in 2023.
- 2:05:42We're now coming back because the window manufacturer was the door manufacturer was not spec. The colonade was built differently from what's on the plans. Some light fixtures were installed and the corugated metal color copied. It's not like we ignored this board. We have aired in carrying out what we thought the board's approved instructions were. So, please just recognize the fact that we discussed and agreed to two over two windows. We discussed and agreed to a marble pollenade. We discussed and agreed to corrugated metal. Let's please focus on the things that are officer Fox picked up the things that were different from the application. When you start to introduce 6 over6 windows, maybe a mistake was made. Maybe we all overlook the possibility that there were six over six windows. But, you know, this building was in such terrible condition.
- 2:06:44It can always be agreed that when these wood windows, which will eventually need to be replaced because they're not the modern windows, they can be replaced in a different manner. But for now, we have an ongoing building that is going to contribute very important tax money, revenue in terms of the hotel tax, employment, all of these things. There is a larger issue here than strict adherence to an ideal. And I will just close by saying that I always say that perfect is the enemy of the good. Please don't try and make this perfect because we will destroy what we have achieved together. Thank you.
- 2:07:37Struggling to figure out the best way to do it. You guys were approved. The Payday clearly says that you guys were coming back to give specifications on the windows very much contradicting the fact that you guys were saying that they were verbally approved. The piece of paper that you guys were compiled said that they are not.
- 2:08:06So I I understand that. My understanding failed was not that there were two over two windows. So we had two that were likely to be approved had the client come back. So image that's not changing. But you know the difference is that Renaissance picture the picture say well we didn't know we thought you were going to come back
- 2:09:38I I disagree with you because the certificate of appropriateness is the contract
- 2:09:43but if you if you look at the meeting minutes from the meeting when it was approved there are several commission members that say we approved the concept of the design we approve that. That's the words that are used, the concept of the design. So, if the concept of the design isn't two over two windows, what is the concept of the design? Just that we're going to have windows there, right? And and the word specific
- 2:10:04I think it was the massing was really
- 2:10:06Well, this was specifically related to windows. So, specifications to me means manufacturer specification, material specification. Concept is what is it going to look like? Um, so maybe this is a lesson for us all to be more detailed in how we present and detailed on communication side of how things are approved. But again, this is why I'm getting back into this like retribution mindset of we keep being reminded of mistakes that are being we can't go back.
- 2:10:35Can we not use that word retribution? This board is evaluating what's ahead of us. This is super hard to follow, but twice that's been said. That's not what's going on here. We're trying to figure out through the the labyrinthian mass of of what's been presented and what's been violated despite the fact that it was mistakes made. I think we're just trying to figure this out. So if you I if if we could and Victoria maybe you can guide us. If two over two is actually what was discussed and presented in the minutes and approved and there's no, you know, there's no evidence of the contrary, I think we could make, you know, we could probably say the two over two is the way to go. But those specifications of those windows weren't approved. So, we'll have to look at those as well.
- 2:11:23Yeah. I mean I I mean, I think we should go back to the minutes and if the applicant is saying they watched the video and they read the minutes, you know, put it in writing and let us take a look at it. Um, give us your argument and then the commission has to evaluate whether two over two windows are appropriate on this building.
- 2:11:42Uh, Victoria, can you hear me?
- 2:11:44Yeah.
- 2:11:45Uh, yes. I believe or I think I believe uh that the product of this commission in other words what our voice is uh to the applicant is not the minutes per se it's the CFA
- 2:12:06and I believe and
- 2:12:07that's true the issue though Phil what they're arguing the the nuance here is the CFA is very clear that they were not authorized to install new windows without coming back to the commission for approval of the window specs. But their argument is that specs meant manufacturer details, but that you had conceptually approved two over two. And so, you know, that doesn't come out in the CFA. We all know they could shouldn't have put the windows in.
- 2:12:36Then there's no conceptual approval. Our process is a dialectic. We argue, we fight, we disagree. uh and through that process we come out with a product that is followable and presentable to the applicant which is the CFA. Uh I'm not comfortable saying that the reference point therefore or the speech of the commission is embodied in the minutes. It's embodied in the CFA and you either do it or don't do what's in the CFA.
- 2:13:17Oh, I agree.
- 2:13:20But I think it's useful to refresh the board's discussion. I mean, this this was three years ago. Yeah.
- 2:13:28Also, can't we aren't these meetings transcribed and recorded? If we you know, if we isn't it possible to forensically examine whether we we thought two over two was good at the time? And if so, then you know I agree there's no doubt that doesn't mean we'll approve these two over two windows but there's no reason to relitigate 2 over2 versus six over six right so these is that possible John
- 2:13:54that's not what I'm trying to do here I'm trying to say how do we move forward I don't want to relitigate anything I don't want to be in this position at all it's unhelpful nonetheless it's the one we're in what is your thinking about what we do with the the public comment? You frequently ask for a public hearing. Are we now going to put the public comment aside or how do we incorporate it?
- 2:14:25I mean that would be we can we can that this is that's what the discussion should be, right? Like we're allowed to have that discussion. Absolutely.
- 2:14:33Okay, then we're we're trying to that's why I put discussion. I'm just saying that if we if we had already discussed 2 over2 versus 6 over6 in 2023 as a commission, it would just be, you know, it would be supportive evidence that we might that would that would be that would favor the case for accepting these two over two windows. I'm not saying it's just positive. I'm not saying it's the only evidence and I'm not saying that we can't revote on this. We absolutely can. But that's that's the only thing I would want to know.
- 2:15:03Mhm.
- 2:15:04Because I do think that I do think that despite the fact that Walter, you know, Walter, you said that you mentioned that there's no that that these plans weren't followed that our CFA was not heated. It wasn't right. It was. And it and it doesn't seem to be an accident. Aren't you the you didn't you present this to us? So I I think but that said if we really were working towards a two over two submission and that these windows are acceptable to us then I think then that would be something to consider even as we evaluate Mr. McGee's response.
- 2:15:37Uh this is Miranda. I just want to reflect back some of the issues that have come up here. Um I b I agree with you John. Basically, I think Carara has done a study of what photographic evidence is available, used her knowledge as an architect to figure how these things could be built and how this may be different from what was agreed to before. I think that's what we have to count on Carara for. And I think having Carara and Walter talk together about what could mitigate what exists now is a useful thing. But I don't think it should all rest on you. There's a reason why there are multiple members of this commission. The public input is also part of the the uh evidence that we had and so is the minutes. That's why we have minutes so that we can recall what we discussed in the past. I agree with our the attorney that our goal here is to mitigate what has turned into an awful mess and that we need to come up with an elegant solution that makes this building as beautiful as it can be.
- 2:16:53There may be some of the changes to the plan that was approved that can be mitigated and should be mitigated and that's we need to have those principles in front of us as we look at what we're going to discuss and I do believe that we should gather the minutes for the discussions that we had in the past on this so that we know how it arrived at the place where it was incomplete and where it construction began and certain mistakes were made.
- 2:17:23Charlie is saying that or whatever have been stuff that we should agree to that was embodied uh in the CFA could the CFA actually be the starting point the Ca that actually wasn't implemented. Wouldn't we begin there?
- 2:17:50Yeah, I get and I I I agree with you if there's approved. Um then there's small differences from that, right? Like the color of the siding. Um but things that hadn't yet been approved and were still some bad for like uh window doors and marble um those they were never complete decisions. They were never contractual. Um, so they need to be redised. There's no final decision on any of those items. Um, also I think it's important that you get Victoria's take whether or not you can meet with Walter to come up with a plan and I'd have to talk to my council, but I don't believe I sit to help you guys. I may have
- 2:18:46I couldn't hear Nick. Nick, can you repeat what what are you checking with council on?
- 2:18:54Um, well, the first thing was the suggestion that Cara should meet with Walter to come up with a concept of a plan to present to the HPC. I I don't know if that that's up to you. I just wanted your take on that. Um, Carol also asked that I sit in on that and I would have to talk to my council, but I don't think that I'd be able to.
- 2:19:19Oh, so I don't I mean, so let's just I don't think Carara can come up with a plan, right? It's the applicant's job to come up with a plan to present and it's the board's job to give feedback. However, I I do think it's okay for Carara and Walter to meet for the purpose of Carara advising Walter of her, you know, what she her findings and her suggestions so that he can evaluate them and decide what if any he wants to bring to the board.
- 2:19:46I I just I I don't like the idea of doing no no shade to Walter because Walter's great, but um I I feel a lot of pressure being one person put in that situation when I wasn't involved in 2023. Like so all of this history I know nothing about. Like there needs to be somebody present that can actually reflect that or else we're just going to get more more lost because I'm going to be kind of
- 2:20:11if you don't want to have a meeting, there's no obligation.
- 2:20:14No, no, I mean, I don't mind helping. I just I just want to make sure that that it's well represented. And I feel like to well represent it, there needs to be more than just me present
- 2:20:25and I don't we're talking about something that does it. It's becoming timeconuming, right? I spent a lot of time yesterday now take spent four hours today. Like I have a life, right? So I do need to make sure that I don't, you know, spend all of it doing this stuff, right? Like this is voluntary, right?
- 2:20:41So why don't why don't we take a step back? Why don't why doesn't everyone just come to the next meeting prepared to discuss the open issues which is window style the colonade and the the color of the sighting. I'm sure there are some other details but those are the the big things to work through. So
- 2:20:58also I would just say that this situation of like passing an iPad around when we're talking about detailed drawings is impossible right like I have
- 2:21:08but like I can't like it's just this is not helpful. Agree.
- 2:21:15Um, just this is Paul. Regarding the window style, any of the more contemporous photos we have of like 402 and 404 shows one over one. And that was obviously, I'm going to say, changed at some point in history. And I think there was a reason we went to making the decision that it was at least two over two that it was more appropriate probably for the time period and the buildings on fourth.
- 2:21:41Um they at the time too when we when this project was started they were one over one windows. So I mean if anyone wanted to say like for like I mean that's you know the fact that the decision then apparently was to go two over two we thought was much more appropriate uh for the project at hand. So um again I I apparently the specs were I guess never presented. I hate to say we based it on concept, but I I think there probably was more discussion and six over six, whether it was entertained or not, one over one were actually in that those buildings at that time.
- 2:22:26That's a that's a good point. So, you're basically saying they could have went one over one and we would have had no nothing to say about that.
- 2:22:35Correct.
- 2:22:38Interesting. I could also ask uh would it be possible for you Jan to find the minutes from the meetings where this building was discussed?
- 2:22:48You fabulous person.
- 2:22:51Or I could also make a suggestion. Could we find the transcript of the recording?
- 2:22:56I think we should put this on the applicant, right? That's all along with all of the four months ago about four months ago. I can share that with all other um and happy to do that. Um but just my recollection I'll go over it again is that we did visually look at 2 over2. We did best two over two and the overall objective during the course of it wasn't just one public hearing to make uh was to simplify that's why we need to take off the the coral some of the corals they were called so it was simplification to go back to I guess the uh because it had been tripped up over And so the idea was to go back to the
- 2:24:01and that's my point about going back to the minutes. It will give us the context that we were looking at.
- 2:24:07Yeah.
- 2:24:08As we made the decision. It's not really about a specific thing like two over two windows, but what were we after? What were we talking about? I do recall that that we gave you asked to give at one point a conceptual approval perhaps because you were going for funding or something.
- 2:24:27It was with the planning board. We were also before the planning board,
- 2:24:32right? So we gave a conceptual approval but that was not an approval to the detailed plans. That was just to help you get to the next step of the planning commission. No, they must have had approval because they got a CFA for at some point, right?
- 2:24:48Yeah, they did.
- 2:24:49So, I think there's two questions, right? I think also let's let's assume that we're going to let's assume we're going to unearth and discuss whether it should be two over two or not, right? I think the for me the bigger issue really because I have a feeling I have if I had to game this I have a feeling we're going to find out that we had a long discussion multiple public hearings and it was always two over two and now we would be reconsidering six over six I think but that may well that I think that's certainly within our prerogative given where we are.
- 2:25:18I would say the bigger and maybe the bigger concern to me is the facade, right? Which the facade isn't a question of like, oh, um, you know, let's let's come back and put a marble facade here. It what was done seems to be, and Victoria, let me know if I'm wrong. Seems to be contradicting the CFA. It's not just like a lack of a spec. It's this is we we wanted to know what was to be done if you pulled even as you just pulled up that CFA before. And that's not that's not what we're getting. That's not what we seem to be getting now.
- 2:25:50So I think that I think I think the the colonade and the and the treatment of the marble is a is going to and and the the removal and discard of the historic marble. I understand Carol you think like we can use reuse it inside, but I think that to me is a is a is a larger is my personal larger concern and something that I'm going to be more focused on.
- 2:26:11Yeah. I think that the window Yes. Either way, but Right. I'll take responsibility for pulling together the the minutes and making we'll run it through Otter AI and make a transcript. Right. So we'll we'll put that together so the board has some basis to start with for the next discussion.
- 2:26:36Uh if I could just uh one other thing because I do think some sort of workshop meeting is a really good idea with Walter. Um so you're a seven member commission. Is that correct? So, not just yourself, Carol, but three members would be able to sit down and meet with Walter. Um, and he's probably going to staring at me right now, but without violating any law. Um, and and and if Nick wanted to attend as well because he's not a board member in my mind, um, I defer to Victoria, but that would also not be violating any open meetings law. Um, I'm happy to give Mr. Howard a call too as well and have that discussion with him.
- 2:27:15I mean, I think the board is certainly they're they're allowed to do that, but honestly, I think it's going to go farther just having this discussion at the next meeting because I think you're going to need everyone's input.
- 2:27:28Victoria, we can do both things.
- 2:27:30We really can. There's no harm done. I can't I don't know what the damage people have conversation. Usually, it's useful. Um, would it be helpful, and you tell me if I'm wrong, if there were a special meeting just regarding this and outside of trying to get everything else done?
- 2:27:54Yes.
- 2:27:56Yes. How about that?
- 2:28:02So, let's talk about preparation for that. Uh, Victoria is going to provide in some form uh minutes or an AI summary or both thereof so that we understand what happened. We'll pull all of the stuff that actually wasn't C of AS and what that we will uh present that in special meeting.
- 2:28:30uh Walter and his team will present whatever they want to present uh as as what they want to build going forward and I think we can get done everyone suggest a brand new application with the drawings corrected to show the existing conditions we measured the colonade. We've supplied details, everything. My own personal feeling is at the end of the day, the quality of the marble and the way that marble goes on this building will solve most of the problems that I personally have. I can't speak for you all. Um, but we do have an application for you, a new application with new drawings and the specifications that we miss.
- 2:29:33so that we have time and focus on uh any thoughts and feelings about a good date for that.
- 2:29:51Want to do it on Thanksgiving? I'm told that I'm only coming over.
- 2:30:02That's why I'm trying it. That's why I want it on Thanksgiving. Well, you do if it's unpainted and then being painted.
- 2:30:39If there's unpainted brick, you'd be okay with someone painting it. into
- 2:30:50let's do not our meeting is on
- 2:31:07uh because
- 2:31:07because Thanksgiving We we move the schedule in. So the six would be great.
- 2:31:19Sure. Unless you want to do it as a cocktail thing.
- 2:31:25Is there anything else?
- 2:31:28Is there anything else on the city agenda on that day? No.
- 2:31:32Oh, I see. Can we have the room? Got it. Uh oh,
- 2:31:47we have one in the room also. Go ahead.
- 2:31:49Yeah,
- 2:31:50thank you. Uh a long time. I'll be real brief. And I'm not going to get into the uncertainty today, but there's a sound willing question I have is there's a lot of people work together, you know, absent the stuff that you discussed that might work, you know, something not done inside the building, there's a lot of work to do. And I know one thing, that building has been vacant for well over a decade. And quite frankly, I I feel responsible for convincing the the current developer into taking on that.
- Part 2
- 0:02Excellent. And
- 0:06It's It's really unfortunate that I got to this point, but it's here. But let's think about lifting the stop work order so something can get back to work. That has nothing to do with the interior.
- 0:19Thank you. Thanks for your help.
- 0:20Thank you.
- 0:22I just got If a decision on the windows was made, could work proceed?
- 0:28Uh that could be
- 0:30The officer found that we believe you submitted uh a separate building permit application for each of them.
- 0:37So
- 0:38Oh, sorry.
- 0:39No, I'm sorry. I'm not going to touch that yet.
- 0:41So it's
- 0:48The all of the violations and everything now, but he can put the stop work order on at all work.
- 0:54Mhm.
- 0:55Yeah, I might have to go back.
- 0:56Um but they did submit a new building permit application, which we had a very, very hectic week at code enforcement this week. And I haven't had a chance to review it yet. Um but I will. I promise you that I will. I Well, this would be this would now separate exterior from interior, and they and they would be able to get people back to work on the inside of the building um if I can approve that application.
- 1:28want to approve it today. Okay.
- 1:31Mhm. I might I might I might be able to do that.
- 1:42It's totally up to Nick.
- 1:44I have to review that application. I'll do it when I get back to the office today. Everybody else in my inbox can wait.
- 1:50Okay. Thanks very much for your help. that.
- 1:56Yes, if I can approve it. I also have to talk to Blair about it. Uh ladies and gents, I think that's sufficient again.
- 2:07[laughter]
- 2:08We got to go out early today.
- 2:10I think we got to get off the bus right now. No.
- 2:15Uh yeah, yeah.
- 2:16I forgot about the e. Thank you very much.
- 2:18Thank you very much.
- 2:20Mr. McGee, would you like to speak? Mr. Kapnecki?
- 2:24He's all set.
- 2:26Are we adjourned? I'm sorry, I can't follow this.
- 2:28No, John. We're we're waiting for Mr. McGee and Mr. Kapnecki to speak.
- 2:35Yes, thank you. Here's Mr. McGee.
- 2:38Uh yes. Uh regard regarding the windows on the historic buildings, these are all Greek Revival buildings. And Greek Revival buildings were built at a time when the largest window pane would be one that's in a 6 over 6 window. And that's what was used because it was modern and contemporary at the time.
- 3:10Uh and that is the reason for believing this house had or these buildings had 6 over 6 windows. Uh I don't know their real date. I'm not sure if it's available. I know the city records were lost. And the date they like to put on things as a placeholder is 1880. But that's not the real date of the buildings when they were built.
- 3:40And unfortunately, the later photographs are not helpful. They can only show you what was there at the time. And one of those images was rather odd. It I it had the appearance of maybe being 402. But there were a bill buildings on either side. So in that regard, I don't think it was the right address.
- 4:10Uh and I think the rest of it is still in the air, but I I think it just to be clear those are Greek Revival buildings. And I fully support removing the brackets on the main building.
- 4:29Uh because the entablature that's up there uh is Greek Revival and would not have had those on it. Uh and the same on the little buildings on North 4th Street. The entablature was free of probably free of brackets. And and finished with a white finish and polished to look you know, make you think of marble.
- 5:02Uh On the rest, I think it's all kind of clear. So you know, there's pointing problems and other things that are to be weren't weren't being corrected. But the the primary thing is the colonnades and and doing it right.
- 5:26But anyway, the windows there's it's easy enough to identify what they were like originally without actual photographs from when the house was built. Thank you.
- 5:41Uh that's it.
- 5:42If I could just make a few brief comments. First of all, just as a matter of clarity, uh Matt and I are not the same person and sometimes things statements are attributed to me which are actually have been made by him. So, just for the sake of accuracy, I just want to bring that up.
- 6:04In terms of the record on this discussion, there were extensive discussions of 402-404 in the first few months of of 2023. The minutes are available online on the city website. The videos are available on YouTube. It's a little hard to track down the videos from time to time, but these items are there and they're available now. I mean, I've looked at them myself. An AI summary generated summary of of the discussion would be useful, but these records are already already available.
- 6:40I think the commission in the future should be wary of granting conceptual approvals absent strict monitoring of compliance with the C of A. I think you you see what can happen in this case when when that sort of thing is done. It it it just prolongs the process and I think if there things had been dealt with more strictly at the outset, ultimately time would have been saved.
- 7:10And finally, as far as I understand it, if if the commission has a meeting that involves a quorum, that meeting is subject to the open meetings law. I don't know what Mr. Howard might say about this, but my understanding from my experience in the past has been that if a quorum is present, it becomes a public meeting. Thank you.
- 7:34Thank you very much. Anyone else? Or can um I go home I'm still driving. I'll sit.
- 7:48The proposal was to have a meeting that lasted
- 7:55We're having a meeting, but it's not physical.
- 8:01No, I was responding to Mr.
- 8:07I shall have to call it separately. Uh motion to adjourn. I opposed. Yeah. We're closed. Thank you, Irwin.
- 8:21Carol asked for sound. Yeah, maybe she's there.
- 8:27Have you scheduled a special
Timestamps link to the corresponding moment on YouTube. Auto-transcribed, contains speech-recognition errors. Not an official record.