- 0:00Hello everyone, welcome to the infrastructure committee for November 9th, 2026. The attendance is Roni, Rob, DeJuan, Henry, and myself. It's going to be a quick one tonight, we have a meeting at 6:00 for the budget, so Rob's going to try to go quick. I'm not sure it'll be a lot of time for questions. Rob, take it away. Thank you. September septage was $52,500. At this stage, you know, we're looking at a pace that is certainly comfortably above what we budgeted for revenue this year, so that's always
- 0:47a good sign. At the plant, you know, we rebuilt the plant in 2010, and a lot of what we put in was brand new but some of it was certainly refurbished existing and so some of the concrete repairs that were done 15 years ago are really starting to show their signs of deterioration you know we did put some money in this year's sewer budget to get some of this addressed next year but this is you know these are just a kind of two kind of examples of of what's going on
- 1:22and then a secondary issue when it's with the clarifier is that sometimes the pieces will break especially in the winter time make their way into the tanks and you know they can catch along the rails and they provide just enough resistance not enough to trip the fault but enough that the forward momentum kind of keeps going and then they end up kind of coming apart and twisting on themselves so i think during the tank uh you know we lay out what sections of chain are there you know
- 1:52these can be put back together there's uh there's splice pieces you don't want to replace everything uh you reuse which flights are good and uh you know replace those that are broken and uh and picture four just kind of shows you what it's okay afterwards um we we received comments from uh environmental facilities corporation efc which is like the bank for dc they're the ones because our 60 million dollar separation project and you know for the first half of that we sent our design plans to them we received comments
- 2:29back from them a month ago um and our responses were submitted a week ago friday so we're hoping that there's a relatively quick turnaround time for that since it was really just punch list items and questions that they had and then we get a their approval to put this thing out in the streets and we're hoping that we really want to do that hopefully in november but certainly in december we also some of you may or may not have heard you know we're the shipping of another 11.9 million
- 3:03dollar we a grant so with this current project that we're doing the 60 million there's there's three major grant programs involved in it one is we got um so this one is for the next phase so in order to separate 100 of the city the estimate was 180 million dollars we're doing 60 plus million dollars now the next phase is about 50 million of which we've got 12 million in the and grant money and we're going to continue to apply for more and more grants from different
- 3:35projects to attempt to bring that down but you know this wouldn't be a project that we would necessarily be engaging for another four or five years because we still have to you know complete the one that we have the debt service for and is already in play but you know it's building it up over time uh we did receive oh just water um you know we were underway with our cyber security grant that was awarded over the summer and that's a 50 000 grant part of it is uh detailing the existing system platform that we have
- 4:16part of it is actually there's a consultant company that gets paid to break in to the skater and the trying you know they don't actually do anything but they it's kind of like that movie there with the arnold schwarzenegger and the uh what's his face there uh john but they they get paid to break it and uh so then they identify what issues and exposures we have you know if any and then from that becomes a report that report will be used to seek further funding down the road for whatever we need in terms of upgrades um we also we applied this
- 5:01year for in the water plant for a plant event for the water supply which is basically before the plant out in the reservoir and further and uh you know we did have a conference call with the mayor's office and ocr last week they wanted to kind of have kind of pick our brains and specifics of some of the points of this and they've asked us to make some modifications to the application which we will do and then submit those back to them um in the uh 2020 well it's not really the
- 5:34budget but because it was going to be purchased and reimbursed through chips but uh the street sweeper that we ordered over a year ago we received on friday so here's a picture of that and it's not in service yet you know it has to be registered insurance has to go on and the team once that's ready to grow ready ready then the uh the company has to send its reps in the trainer guys and how to use it and all the functions features so that'll be another week
- 6:03or so. I understand it's silent. It's, yeah, you won't even hear it coming. And then LightServe. In front of them. Yeah, right. So that said, we have an existing sweeper that is about 11 years old and, you know, we gave a resolution through the council to surplus a bunch of equipment and we're just going to add this to the list and hopefully we should get a nice chunk of change for this sweeper but we certainly don't need two sweepers um does that all just go general fund or
- 6:41what happens yes it goes unless you know certain members of the council in the year market for a capital equipment replacement fund like a garbage truck or something like that that may have been removed from this year's DPW budget. I mean, that would be grand if the money was redirected there. That's important. Can we do a capital fund that spreads that out? Does it ever seem like to save up for? My experience with capital funds is project-based. I'm not sure equipment-based, but my understanding is that capital funds will roll over year after
- 7:19years so yeah you can keep kind of chipping into it as you see fit i am in the process of seeking there's a grant through um dec and it's part of recycling and waste management and equipment is supposed to be eligible it's a 50 match but you know if the new garbage trucks 100 or 250 000 hours and you know obviously it becomes an assessment you know um so yeah the um you know uh we've been doing some work on uh on union street so about six or seven years ago we got
- 7:58this green infrastructure grant and we had these tree planners and you know i mean it was nice on paper in theory but the issues are that the it's still soil so when you have a head and they have overflow drains but they're like four inch strains so when we have these torrential downpours university turns it's like a swimming pool so we've added a couple extra basins so that way it'll take the water and divert it directly into the old forest bank which is now a dedicated
- 8:29storm line and that will carry that away and remove that water from the from the street and we've done it you know so picture seven we excavate the down in the bottom underneath the white stream is the actual old gas on force main we put a wrap around cut out penetration through it for the wrap around sleeve and then put this 45 on it and that gets over tied into the basin backfill uh that was up in an upper 455 ish and then we did another one
- 9:04you know down at 4 30 5 32 the same principle you know excavating exposing the main putting a new base and tying it in uh in addition there's an existing uh basin directly across the street from the new one that is tied into the combined sewer so since we're there and we're exposing the the main we're going to actually migrate that basin from the combined sewer and move that over to the uh storm line itself so we're actually removing uh three structures adding two new and
- 9:40removing a third this is still in part of something you're talking yeah yeah we've got to get it done like within this week or so because the asphalt thing closes around thanksgiving week and um so we're at a point now where we're selling the private contractors that whatever projects they have in the works these are the last ones for the season because once the asphalt plant closes and we can no longer get hot asphalt it's emergency excavations only because unless you drive to new jersey to a plant that runs 12 months out of the year and have it pay for a heated box to bring
- 10:17it all the way back um you know we most people use coal patch and it's it's fine as a patch but it's not durable you know every time there's snow plows hit it we just rip it right out again and have to go put it back in um it's a patch so we want to get you know final restoration with asphalt and then button things out for the season uh this is just you know like we've had discussions before you know there's you know some restaurants are better and others at maintaining their grease so
- 10:50you know this is on prison alley and um you know so when issues like this come up you know we we die test to get an idea of what possible culprits are then we work with code enforcement and then we go you know knock on doors and and have discussions with uh the owners and operators and let them know that you know if you grease trap is required but if you don't regularly maintain it the grease just stays in suspension and short circuits around it and as soon as it hits the you
- 11:23know the what's in the main it starts to coagulate immediately because that's time again with all the other flows so this is completely there's no outlets you can see that's pretty well obstructed yeah i mean this is what it was like at first we dug it out but yeah you know there was some complaints of flooding this will do it um this is just uh you know i was at a starbucks last week and you know from time to time people say how come we don't have recycling bins on warden street and
- 11:57i said well because of this because you've got landfill compost recycle and all three of them had exactly the same stuff in it yeah so you know that as soon as these go back in the kitchen they're all just getting lumped together and just getting going to waste management in the dump service um parks south street park is out to rebid again uh the scale has been reduced again uh and so we've been opening the schedule for december 2nd uh also you know last week i met
- 12:33whether this week this week maybe this week last week um and that was the engineers and designers for the oakdale playground project as a carol's williams project and um you know they will want to clarify what dpw's in-kind services can be and uh also you know go through utility connections and you know try and see what what's the best approach because both parks are going to get or scheduled to receive bathrooms so they need water and they need power and they need sanitary so some benefits can be determined by others. Can I ask you
- 13:16you sort of came up uh when we had a presentation about the Oakdale Park and um the fact that the park kind of maintained by the youth department I was interested in having the bathroom more available as it's all like that it is public money but they were in the details no the bathroom that will be built and of course um but it's not indicated that it would not be very these are not available except when they are yeah these are these aren't year-round buildings oh i understand
- 13:49that but i i think they could be at least as available as the one down at the waterfront yeah they open it we open it and closing them well well that's what i'm asking i guess what i'm asking is would dpw take take ownership of opening and closing that well who else is going to do it i think that they would do it and they would only do it no no no no no that's locking hbd locks it every night at nine o'clock and dpw unlocks it at seven in the morning and there's
- 14:23presume you know whoever is a key holder can open it but hvd is still going to have to lock these things up during the season but during the winter that's all i mean yeah the during the winter is you know they're going to have to get that's why we were having these installed with quickenix so that way we just like we do at the dog park there's a quick connect we shut the water off we put the compressor on it blow the air it shoots out the end and then that's it you leave
- 14:50it open it wouldn't be closed doesn't make any difference yeah that's right so but but in warm weather it'll be open from six to nine yeah or whatever yeah but certainly down whatever six thirty seven left to the night now okay great um so that i don't know if you've seen but you know the charles williams connector uh that that trail was uh installed by the clc uh i it's important to understand that this is a trail this is not a sidewalk or it's not paved so there's you know
- 15:26you can't put salt on this it'll turn it into a monk you can't put equipment on it it will have you know we'll have rucks in it and it'll be muck um so you know as long as there's a nice you know maybe the sales but the stairs will be open but um you know this was a discussion that came up with the clc they said they didn't have the money to blacktop it in their budget and so this was going to be a a tread off so i don't want anybody to be surprised when there's
- 15:56a foot of snow when the snow is still there you know two months later um and then you know just a couple other things going on there's you know putting the lights in the trees uh for the holiday season so we do every year you know about a third of the way through and then you know we still get a couple of weeks still got a couple trees that are holding on to their leaves obviously we need the leaves off before we can finish all the trees and then the last picture is uh you know catsville
- 16:30has got some issues going on with their street lighting installation after their their capital project so they're borrowing their light tower right now until their utility is up and running that's it for me um thank you rob that was nice and efficient um yes i'd like to let allow enough time to for people to get us up for the budget meeting but i think we have enough time for a couple questions um anyone online no anyone else far we got the table here Um, yeah, I'm Diana. Last month we talked about those, uh, the plant beds on Warren Street,
- 17:17or on Town Street, and there was some back and forth of our emails saying that, yes, the landscape architects were taking a look at it and would use the plants and that they would be ordered. I just wanted to know the update on that, just because I'm concerned about it actually happening especially with regards like what money will be used and does it need to be on that the consultant involved in great times but nothing has been ordered yet because this was not budgeted so we'll see where we are at the end of the year and then we get back some quotes
- 17:50and we have the money for it and we will encumber it till next year otherwise uh we'll have to look at next year's budget and see what money is available for it okay okay jenny um i went down to the trailhead at the third street trail and um i couldn't find it initially because there's no signage and there were cars parked in front of it so i don't know is there going to be i saw that parking situation and here's early railing um i i guess it seems like it's an
- 18:30oversight of the project unless the project is still going to do that um or obviously anything that we can do i don't know you know i don't this was this was not a city project so right they all they did is uh they told me they had agreements with the you know the legislature and the mayor and they just did their thing um if you want no parking signs there's something that has to be approved by police commissioner because it requires enforcement whether the medicine enforced or not i don't i don't get out to that i mean there's a there's actually a uh a guard rail
- 19:02yes pickup truck parks there and it looks like are you talking about third street or no to enter you just go around the left so maybe i think just indicates where it is yeah so the there is one car that has been parking there for about 15 years or so it's a red pickup yes Yeah, I did talk to Nick about it a few days ago. It is on city property and he's going to address it. And we were talking about a sign as well because it is hard to find or
- 19:33just maybe a no parking sign. Some sort of signage. Yeah, it's not a good deal. I usually don't pay for them. Well, should we contact someone from the CLC and see if... They could provide us with a sign? Yeah. well that's okay I mean well if they want to say something I think it would get won't be a big one yeah to figure out the shoes he's gonna keep rolling so that we can lloyd just real quick lloyd will be getting your voice of reason I want to thank bob perry which city has summoned that into people like this
- 20:10diligent good work he actually like as far as the garbage trucks go and capital fund and earmarking money. As I understand it, there was a garbage truck in 2005. There was a garbage truck in 2015. It seems like the garbage trucks are on a 10-year rotation and we're maybe a year or two behind in that rotation. So I would like to see, you know, some effort towards, you know, providing the gentleman, his department with the equipment they need. Now, onto the tree of peace and I am indebted
- 20:43to the DPW and Mr. Shefsky, Eugene for they have placed the tree in the Greek most prominent prestigious worthy spot of such a symbol of decency and goodness and peace. So I don't know how much time do I have? I'd just like to give enough time for Margaret to get set up. So I just want to say, excuse me I'm just trying to finish here so It was because that Rob spotted the Tree of Peace and took the aerial photo that I was able to locate it and then save it from the tree.
- 21:24Now, that was back in May. Okay. And if you put your hand down, you're distracting. His hand's fine. I'm just saying. So I had the tree. I saved it on May 12th. And May 17th, the tree, some people absconded with it. these people they were so rude about how they went about it it was indecent because i actually was caring for the tree two minutes please two minutes right and just a quick update and i'll wrap it up right here is when i had the tree back then it was the roots were saturated the needles
- 22:00were green now it's brown needles it's brown needles and the person that took the tree and the caretakes are the steward on the job okay we still have to maintain grace thank you we just need to move on because we got to make it fine thank you i'm going to still use an action live in hudson like unlike the previous speaker um i'd like to ask mr perry a couple of questions if i could um as i understand it when the chips project below mr perry can you put your phone down would that be a respectful thing to do bill i don't need
- 22:36I don't need to be respected for you either, but disrespect to you and be in this city. Can you listen to me? Is that okay? I'll ask you a question. Continue with the question, please, let's go. Let's do this. Typically, the CHIPS projects are late at least, maybe in the last eight or six years, when an intersection is repaved, it gets crosswalks. The contractor puts crosswalks on, or hires a contractor to put crosswalks on. Last year's CHIPS project included three intersections, correct? okay yeah it did okay only two of them got crosswalks the one that didn't is a fifth and
- 23:13union they're wondering why fifth and union has no crosswalks and um no stop lines either but why didn't union and fifth the intersection get four crosswalks okay blank do you have one more question just like a second and allen and say the three four answers do you have one more just didn't get to get us didn't get them do you have one with questions or not why would why were those crosswalks left off the chips problem yeah we probably didn't need them all right okay do you have no more
- 23:40questions that that you that's that was your understanding at the time you told the contractor not to put problems i'd like to give the council five years at the same time yeah uh we need to transition to the next meeting um i have a motion to adjourn um motion seconds on the next side uh This meeting is adjourned and turn it over to Lexi.